3. Plumbing riser: Please provide domestic water and sanitary plumbing riser diagram.
Thursday, February 23, 2012: Received provide domestic water and sanitary plumbing riser diagram. Please revise and add the floor drains and trap primers.
|
| |
|
|
4. Electrical Plan: Please provide (1) an electrical drawing showing power and lighting, (2) panel schedule (branch circuits, voltage, service size, phase), (3) and the location of the panel.
Thursday, February 23, 2012 Received electrical plans, please provide a panel schedule (branch circuits, voltage, service size, phase).
|
| |
|
|
5. Electrical Riser Diagram: Please provide an electrical riser diagram that includes the meter, disconnect, conduit size, wire size (AL or CU), grounding, panel, ampacity of the service, voltage, and phase. Indicate on the plans where the service is located.
Thursday, February 23, 2012 Received riser diagram, please provide conduit size, wire size (AL or CU), grounding, panel, ampacity of the service, voltage, and phase.
|
| |
|
|
6. Fault Current: Please provide a fault current letter for the transformer that is feeding the building. The fault current letter is provided by the electrical power company serving the building.
Thursday, February 23, 2012 Item remain open:
|
| |
|
|
10. Site Plan: Please provide a site plan showing the entire parcel, the proposed building and the distances to the property lines.
Thursday, February 23, 2012 Item remain open:
|
| |