Plan REJECTED for 4500 repair garage going to be converted to service CHG repair vehicles. Reviewed using FFPC 5th edition. NFPA 1 ch 30 and NFPA 52
Reviewer: Sandra Boike 904 209 1741 sboike@sjcfl.us
To reply to comments and/or resubmit plans, contact your permit tech via their email or call 904-827-6800. To help speed the review process you may include a written comment response summary to clarify or illustrate where corrections were made on plans. Please remember to use the Florida Fire Prevention Code 5th Ed for all code reference in a response to comments. The fire plans examiner does not use or have a copy of the Florida Building Code.
To schedule your fire inspection please call 904 209 1740x1.
------------------------------------
Thursday, February 23, 2017
Px Eric this morning about the hazard classification.
---------------------------------------
Tuesday, February 28, 2017
Reviewed with NO PENDING comments.
|
2/28/2017
| sboike |
|
|
NFPA 1.30.2.4 Means of egress. Please provide illustrate exit identification.
----------------------------
Tuesday, February 21, 2017
Response: Exit signs have been added in sheet F1.0
|
2/23/2017
| sboike |
|
|
NFPA 1.30.2.8. Gas detection, please provide manufacture cut sheets for the components of the detection systems. Please provide order of operation of the system.
-----------------------
Thursday, February 23, 2017
Addressed on F1.0
|
2/23/2017
| sboike |
|
|
NFPA 1.30.2.8.4 Monitoring of the detection system shall be in accordance with NFPA 72. How are you meeting this?
---------------------------------
Thursday, February 23, 2017
Response: The sensors will be installed within the classified zone. The sensors are compliant for class1 division 2
|
2/23/2017
| sboike |
|
|
Could not locate return air openings? NFPA 1.30.2.9.2
---------------------------
Thursday, February 23, 2017
Response: The system is designed as exhaust only. Therefore, there are no return openings in the b uilsing. Please see sheet M3.1 for the location of EF-1,2,3.
|
2/23/2017
| sboike |
|
|
Will there be any containers to store the NG during repair or will there be a process of removing/ refueling the equipment? NFPA 52.4
-------------------------------------
Thursday, February 23, 2017
Response: There will be no refueling and defueling process inside of the repair garage. There will be no natural gas containers stored inside of the repair garage.
|
2/23/2017
| sboike |
|
|
Is there a 2 hr separation from the repair/ storage of the vehicles containing NG and the other rooms? NFPA 52.8.4.3.4.2
--------------------------------
Thursday, February 23, 2017
Response: NFPA 52 chapter 8 deals with processing, storing and dispensing CNG. CNG will not be processed, stored or dispensed at this facility. Therefore, we feel that NFPA 52.8.4.3.4.2 does not apply.
|
2/23/2017
| sboike |
|
|
How are you compiling with NFPA 52.8.4.3.4.5 or 8.4.3.4.6?
---------------------
Thursday, February 23, 2017
Response: See previous response.
|
2/23/2017
| sboike |
|
|
Please illustrate the placement of fire extinguishers. NFPA 1.30.3.2.2 and NFPA 58.8.15
-----------------------------
Thursday, February 23, 2017
Response: Addressed on plan F1.0
|
2/23/2017
| sboike |
|
|
Hazard Classification appears to have changed. Please provide classification from the design professional in accordance with NFPA 101.40.1.5, NFPA 101.6.2. This may trigger additional requirements.
-----------------------------------------
Tuesday, February 28, 2017
Reviewer called Eric about the hazard classification. He stated they will be doing basic maint. This is why they stated Ordinary Hazard.
|
2/28/2017
| sboike |