Clearance Sheet C2005-001743*001 |
|
|
Clearance Sheet is Over 180 Days
|
Contractor:
MALONE II, JAMES ANTHONY |
|
|
Unpaid $0.00(); Paid $2,320.96(0367401)
|
|
Cert Occ |
|
|
Proj Name: |
|
Parcel: |
|
|
Prop Use Desc: |
|
Prop Use: |
|
|
Contractor ID: |
|
Valuation: |
|
Pre:
Street Num:
Street:
Class:
Post:
Zip
Supplemental:
Expedited Review Required:
|
20602500
| 4/17/2006 11:47:47 AM | U FPL 4.03 | VANKIRK, LOREN WESLEY | 0 | 0 | [ (26) Feeder Service Panel Amps 125 - (2) MAIN SERVICE PANEL Amps 1200 - TEMPORARY POLE 1 - ] |
|
30505611
| 12/14/2005 8:37:29 AM | | VAUGHN, JIMMY DAVID | 0 | 0 | [ Fixtures Cnt Unit 243 - Sewer 1 - WATER HEATER Unit 24 - ] |
|
40602663
| 4/13/2006 4:14:54 PM | A | MCGOWAN, WADE S. | 0 | 0 | [ New HVAC Valuation 58032 - ] |
|
60500210
| 10/26/2005 11:15:57 AM | ALRM | VANKIRK, LOREN WESLEY | 0 | 0 | [ FA Devices Device Cnt 10 - FACP w/ Devices Unit 65 - ] |
|
60500239
| 10/14/2005 10:21:32 AM | SPKL | RAULERSON, WEAVER E | 0 | 0 | [ Sprinkler System Heads 288 - ] |
|
10509224
| 9/26/2005 1:59:06 PM | 105 | MALONE II, JAMES ANTHONY | 0 | 0 | |
Log
| BLDG PLAN REVIEWER | 4/27/2005 ktaing | 6/7/2005 jdrummond | jdrummond | Rejected |
Building #2 B type - 24 unit -3 sty condo
| 1 |
Plan Review
|
| FIRE MARSHALL REVIEW | 4/28/2005 ecannon | 5/10/2005 smurray | smurray | Approved |
SENT 2 COPIES OF PLANS
| 0 |
Plan Review
|
| BLDG RESUBMIT | 8/2/2005 jgarrett | 9/13/2005 jdrummond | jdrummond | Approved |
Building No. 2 Type B 24 unit Evaluation 1,989,696.00 Scanned under C05-1743 Building #1
| 0 |
Plan Review
|
| FIRE RESUB MARSHAL REVIEW | 9/14/2005 CJR | 9/19/2005 smurray | smurray | Approved |
needs to be restamped by fm
| 0 |
Plan Review
|
| FIRE SPRINKLER SYSTEM | 9/28/2005 ktaing | 10/6/2005 smurray | smurray | Approved |
| 0 |
Plan Review
|
| BLDG REVISION | 10/15/2005 tbrunson | 10/25/2005 bburden | jdrummond | Rejected |
PLANS TO POST-TENSION, SENT TO WJD
| 0 |
Plan Review
|
| BLDG REVISION | 1/3/2006 tbrunson | 5/16/2006 bburden | BOS | Approved |
ROLLED PLANS/SENT TO WJD
| 0 |
Plan Review
|
| BLDG REVISION | 2/28/2006 tbrunson | 2/28/2006 JHS | BOS | Approved |
ENERGY CALCS, MECHANICAL
| 0 |
Plan Review
|
| BLDG REVISION | 5/5/2006 tbrunson | 5/16/2006 bburden | BOS | Approved |
ARCH/ELEC, SENT TO WJD
| 0 |
Plan Review
|
| BLDG REVISION | 8/23/2006 lbrown | 8/31/2006 JHS | jdrummond | Approved |
STRUCTURAL REVISION
| 0 |
Plan Review
|
Notes
| 10/25/2005 CJR |
rec'd revision from wjd, put in rejected revision drawer
|
| 9/19/2005 CJR |
returned from fm, now with permitting
|
| 8/2/2005 JRG |
Mike Graham spoke with James, New plans/Ltr from Arch/SoilReportsS&S/ 2ModifiedTruss/3EngShtsGoodAddressEachUnit
|
| 5/12/2005 EEC |
PLANS RETURNED FROM FM
|
|
|