Permit #Issue DateInfoContractorPaidDueAssocInfo
21504191 9/15/2015 9:16:25 AMU FPL GRAY, OSCAR H00[ MAIN SERVICE PANEL Amps 200 - ]
31503647 10/22/2015 3:37:01 PMN/A WILLIAMS, JOHN DANIEL00[ REPLACEMENT FIXTURES COUNT 1 - ]
41407072 11/21/2014 4:23:32 PMA JONES JR, JAMES LESTER00[ NEW HVAC Valuation 19000 - ]
41506490 10/14/2015 3:06:04 PMG LLOYD, ZANE A00[ GAS PIPING Outlets 5 - ]
81501667 10/19/2015 2:51:22 PM SUNDSTROM, CARL E.00[ SPRINKLER HEADS Units 40 - ]
11507950 9/9/2015 2:50:12 PM101RAUCH, BRIAN A.00 
11508393 9/24/2015 3:15:13 PM435STERLING, JAMES T.00 


Log

TypeRcv DtPln Rvwd DtRvwdByStatusCommentOutstanding CommentsPlan Review
PENDING PERMIT ISSUES7/29/2014 ccontestabile7/30/2014 jschockjschockRejected Document is not site specific requires an address and an original signature. For information the size of the seal does not comply with rule 61G15-23.001 1 Plan Review
BLDG RESUBMIT9/25/2014 ccontestabile9/25/2014 jschockjschockApproved resub of rejected fema form 1 Plan Review
BLDG REVISION1/28/2015 cgalloway1/29/2015 jschockjschockRejected WINDOW AND DOOR Provide two complete sets of documents and provide Florida product approval number for each model 0 Plan Review
BLDG REVISION1/30/2015 kbarnes2/2/2015 jschockjschockApproved CHANGE WINDOW MANUFACTURER 0 Plan Review
BLDG PLAN REVIEWER9/9/2015 tcarroll9/9/2015 tcarrollccrainApproved completion to original 11405640 (tracking purposes only) 0 Plan Review
BLDG REVISION10/22/2015 edegrande10/22/2015 jschockjschockApproved energy calcs 0 Plan Review
PENDING PERMIT ISSUES11/3/2015 edegrande11/3/2015 jschockjschockApproved FINISHED FEMA 0 Plan Review


Notes

Note DtNote
10/22/2015 edegrande

APPROVED REVISED PLAN IN DRAWER

1/29/2015 krobshaw

REJECTED REVISION IN THE DRAWER

8/19/2014 kbarnes

REJECTED REVISION IN THE DRAWER

8/19/2014 kbarnes

APPROVED REVISION IN THE DRAWER.