Clearance Sheet N2025-000256 |
|
Contractor:
FASANELLI, FABIO M |
|
Unpaid $0.00(); Paid $0.00()
|
|
|
|
Proj Name: |
|
Parcel: |
|
Prop Use Desc: |
|
Prop Use: |
|
Contractor ID: |
|
Valuation: |
|
Pre:
Street Num:
Street:
Class:
Post:
Zip
Supplemental:
Expedited Review Required:
12509732
| 8/6/2025 4:25:43 PM | 649 | FASANELLI, FABIO M | 0 | 0 | |
Log
DEMOLITION PERMIT | 1/16/2025 bmsmith | 1/16/2025 rmauch | mwright | Approved |
Update 8.6.25: Under Section 553.8991(4), F.S., a local government may not prohibit, restrict, or
prevent the demolition of any structure or building identified in paragraph (3)(a) for any reason
ot
| 0 |
Plan Review
|
ENVIRONMENTAL | 1/16/2025 bmsmith | 1/16/2025 rmauch | mwright | Approved |
Removal of protected trees on the site requires a development review permit. Demolition permit applies only for removal of structure.
| 0 |
Plan Review
|
Notes
|
Proposed demolition would constitute an Adverse Effect on a Significant Cultural Resource (Section 3.01.04). Staff will require a Cultural Resource Management Plan, which shall at minimum, provide the following:
1. Potential impacts to the Significant Cultural Resource citing any irreversible or irretrievable commitment of resources.
2. Alternatives to any proposed demolition and options to mitigate adverse effects. Possible options may include but are not limited to: establishment of a historic conservation easement, relocation of a historic structure or object, data recovery (Phase III) excavation of a significant archaeological site, documentation of significant historic buildings following the Historic American Buildings Survey/Historic American Engineering Record standards, and other preservation or mitigation alternatives.
3. Schedule of any demolition, excavation, or any activity causing alteration to the Significant Cultural Resource.
4. Provision of an adequate time to
|
|
HOLD PERMITTING NEED BUILDING OFFICIAL APPROVAL
|
|
|