04/16/21.. emailed rejected comments.
|
| |
Emailed C. Bamford rejected comments- DL plans are located in cubes in hallway.
|
| |
06/18/21- emailed clive ready for pick up... ticket number is 1243095 for all buildings. plans located in cubbies in the back hallway. office copies "106" Job copies "101" paper work cubby "111" KL
|
| |
Email sent stating Approved Revision ready for pickup along with link for OT#1319586 3/3/2022 - In Private Provider Cubby - lln
|
| |
Approved Revision in the rolled drawer,REDESIGN OF REAR ELEVATED PATIO DECK / BALCONY, em
|
| |
REJECTED REVISION ON SHELF FOR KENNEDY
|
| |
Emailed approved fire revision comments 6/13/2022 - plans sent to bldg. dept - lln
|
| |
Emailed Rejected Sprinkler Comments 6/14/2022 - Cubby "P" - lln
|
| |
ROLLED APPROVED REVISION IN DRAWER UNDER KENNEDY // EMAILED NOTIFICATION
|
| |
Emailed rejected fire sprinkler comments 7/18/22, put in cubby "P" dml
|
| |
Emailed revision for pool deck area approved by Fire, routed over to Bldg. Dept. for review. 7/27/22 dml
|
| |
approved rolled revision in drawer,Pool Deck Area , emailed
|
| |
Emailed rejected fire alarm review comments 10/17/2022 - Cubby "A" - lln
|
| |
Emailed approved fire comments for "Revision 14- See Narrative" 10/24/2022 - Plans sent to bldg. dept - lln
|
| |
EMAILED APPROVED REVISION READY FOR PICK UP; ROLLED PLANS IN SECOND DRAWER UNDER KENNEDY
|
| |
Emailed rejected Fire revision comments, routed over to Bldg.Dept. 11/17/22 dml
|
| |
Received "Revision 15" back from bldg. dept 11/21/2022 - Cubby "K" - lln
|
| |
Emailed Approved Revision 15 Fire Comments 11/29/2022 - plans sent to bldg. dept - lln
|
| |
APPROVED REVISION IN ROLLED DRAWER FOR KENNEDY
|
| |
APPROVED REVISION IN FOLDED DRAWER FOR KENNEDY
|
| |
Emailed rejected fire alarm comments 3/30/2023 - Cubby "A" - lln
|
| |
Emailed rejected access control comments. Put plans in cubby "P" 4/21/23 dml
|
| |
Emailed Rejected Fire Alarm Comments 7/7/2023 - Cubby "A" - lln
|
| |
Emailed rejected Fire Alarm comments 7/17/2023 - Cubby "A" - lln
|
| |
Emailed Rejected Fire Comments for Revision 7/17/2023 - Plans sent to bldg. dept - lln
|
| |
Received Rejected Revision back from bldg. 7/18/2023 - Cubby "K" - lln
|
| |
Emailed approved bldg. revision comments, Plans are ready to be picked up and submitted to Bldg. Dept. 7/28/23 dml
|
| |
EMAILED APPROVED REVISION READY FOR PICK UP; IN FOLDED DRAWER UNDER KENNEDY
|