SJC Home
Clearance Sheet C2016-003978*013

Clearance Sheet is Over 180 Days

Contractor: LEE, DAVID JASON
Unpaid $0.00(); Paid $570.80(0939307)
Cert Comp
Proj Name: Parcel:
Prop Use Desc: Prop Use:
Contractor ID: Valuation:

Pre:      Street Num:      Street:      Class:      Post:      Zip  Supplemental:   


Expedited Review Required:   

Permit #Issue DateInfoContractorPaidDueAssocInfo
21801443 2/28/2018 2:29:36 PMU FPL SCIOLINO, JOHN MICHAEL00[ MAIN SERVICE PANEL Amps 200 - WIRING # OF RESIDENCES OR SEPARATE UNITS 1 - ]
31800637 2/8/2018 8:27:05 AM SCOTT, TERRY DENNIS00[ NEW CONSTRUCTION 33 - ]
41801048 2/7/2018 8:38:36 AMA SCHWEND, DONALD ROY00[ DUCTWORK ONLY VALUATION 41850 - ]
41802152 3/13/2018 11:31:50 AMH SCHWEND, DONALD ROY00[ FIRE HOOD Cnt 1 - HOOD Valuation 11280 - ]
41803335 4/18/2018 8:49:50 AMA CHADDOCK, THOMAS P.00[ REFRIGERATION UNITS VALUATION 6000 - ]
41803590 4/25/2018 8:37:40 AMG SCOTT, TERRY00[ GAS PIPING Outlets 9 - ]
61800057 6/15/2018 8:51:13 AMSUP BURKETT, RANDAL L00[ FIRE SUPPRESSION SYSTEM Unit 1 - ]
61800086 4/24/2018 11:12:57 AMSPKLBLAKE, DAVID L00[ SPRINKLER SYSTEM unit 16 - ]
11800203 1/23/2018 12:08:52 PM437BLEE, DAVID JASON00 


Log

TypeRcv DtPln Rvwd DtRvwdByStatusCommentOutstanding CommentsPlan Review
FIRE MARSHALL REVIEW12/8/2017 ehumphreys12/18/2017 sboikesboikeRejected 0 Plan Review
BLDG PLAN REVIEWER12/18/2017 sboike12/19/2017 fbeczafbeczaRejected 2 Plan Review
BLDG RESUBMIT1/3/2018 sboike1/4/2018 fbeczafbeczaApproved 0 Plan Review
FIRE RESUB MARSHAL REVIEW1/3/2018 sboike1/3/2018 sboikesboikeApproved 0 Plan Review
FIRE HOOD SYSTEM2/7/2018 slhersey2/15/2018 sboikesboikeRejected GREASE HOOD 3 Plan Review
BLDG PLAN REVIEWER2/15/2018 sboike2/16/2018 fbeczafbeczaRejected NEED LEGIBLE CAPTIVE AIR PLANS 1 Plan Review
BLDG PLAN REVIEWER2/23/2018 sboike2/23/2018 fbeczafbeczaRejected kitchen hood duct 0 Plan Review
FIRE RESUB HOOD SYSTEM2/23/2018 sboike2/23/2018 sboikesboikeRejected 12 Plan Review
FIRE RESUB HOOD SYSTEM3/12/2018 sboike3/12/2018 sboikesboikeApproved 0 Plan Review
BLDG RESUBMIT3/12/2018 sboike3/12/2018 fbeczafbeczaApproved hood 0 Plan Review
FIRE ENGINEERED SUPPRESSION3/16/2018 mkuehne4/2/2018 VVitorivvitoriApproved 0 Plan Review
FIRE SPRINKLER SYSTEM3/20/2018 mkuehne4/4/2018 sboikesboikeRejected 3 Plan Review
FIRE MARSHAL REVISION4/6/2018 bcalaman4/9/2018 sboikesboikeApproved MEZZ ENG 0 Plan Review
BLDG REVISION4/9/2018 fbecza4/9/2018 fbeczafbeczaApproved 0 Plan Review
FIRE RESUB SPRINKLER SYSTEM4/13/2018 slhersey4/16/2018 sboikesboikeRejected 0 Plan Review
FIRE RESUB SPRINKLER SYSTEM4/20/2018 slhersey4/23/2018 VVitorivvitoriApproved 0 Plan Review


Notes

Note DtNote
  REJECTED PLANS ON SHELF / EMAILED ISSUES
  REJECTED PLANS RELEASED TO CONTRACTOR
  On rolled rejected shelf. Emailed.
  On rolled rejected shelf. Emailed.
  Rejected fire sprinkler on shelf under BLAKE. Emailed.
  Approved revision in drawer. Emailed.
  Rejected fire sprinkler on shelf under Blake. Emailed.