Clearance Sheet C2005-001743*007

Clearance Sheet is Over 180 Days

Contractor: MALONE II, JAMES ANTHONY
Unpaid $0.00(); Paid $3,144.33(0367401)
Cert Occ
Proj Name: Parcel:
Prop Use Desc: Prop Use:
Contractor ID: Valuation:

Pre:      Street Num:      Street:      Class:      Post:      Zip  Supplemental:   


Expedited Review Required:   

Permit #Issue DateInfoContractorPaidDueAssocInfo
20602503 4/17/2006 11:47:47 AMU FPL 4.03 VANKIRK, LOREN WESLEY00[ (37) Feeder Service Panel Amps 125 - MAIN SERVICE PANEL Amps 1600 - MAIN SERVICE PANEL Amps 1200 - TEMPORARY POLE 1 - ]
30505182 11/15/2005 1:30:32 PM VAUGHN, JIMMY DAVID00[ Fixtures Cnt Unit 327 - Sewer 1 - WATER HEATER Unit 36 - ]
40600922 2/6/2006 2:23:30 PMA MCGOWAN, WADE S.00[ New HVAC Valuation 86940 - ]
60500216 10/26/2005 11:15:57 AMALRMVANKIRK, LOREN WESLEY00[ FA Devices Device Cnt 10 - FACP w/ Devices Unit 95 - ]
60500245 10/14/2005 10:21:32 AMSPKLRAULERSON, WEAVER E00[ Sprinkler System Heads 420 - ]
10509242 9/26/2005 1:59:06 PM105 MALONE II, JAMES ANTHONY00 


Log

TypeRcv DtPln Rvwd DtRvwdByStatusCommentOutstanding CommentsPlan Review
BLDG PLAN REVIEWER4/27/2005 ktaing6/7/2005 jdrummondjdrummondRejected Building #8 A type - 36 unit -3 sty condo 1 Plan Review
FIRE MARSHALL REVIEW4/28/2005 ecannon5/11/2005 smurraysmurrayApproved SENT 2 COPIES OF PLANS 0 Plan Review
BLDG RESUBMIT8/2/2005 jgarrett9/13/2005 jdrummondjdrummondApproved Building No. 8 Type A 36 unit Evaluation 2,892,540.00 Scanned under C05-1743 Building #1 sent to James 0 Plan Review
FIRE RESUB MARSHAL REVIEW9/14/2005 CJR9/19/2005 smurraysmurrayApproved needs to be restamped by fm 0 Plan Review
FIRE SPRINKLER SYSTEM9/28/2005 ktaing10/6/2005 smurraysmurrayApproved 0 Plan Review
BLDG REVISION10/14/2005 tbrunson10/14/2005 JHSBOSApproved PLANS TO POST-TENSION, SENT TO WJD 0 Plan Review
BLDG REVISION11/15/2005 ktaing11/15/2005 JHSBOSApproved PLANS TO POST-TENSION, SENT TO WJD 0 Plan Review
BLDG REVISION1/3/2006 tbrunson5/16/2006 bburdenBOSApproved ROLLED PLANS/SENT TO WJD 0 Plan Review
BLDG REVISION5/8/2006 tbrunson5/16/2006 bburdenBOSApproved ARCH/ELEC-SENT TO WJD 0 Plan Review
BLDG REVISION8/23/2006 lbrown8/31/2006 JHSjdrummondApproved STRUCTURAL REVISION 0 Plan Review


Notes

Note DtNote
5/10/2006 EEC 2 ROLLED REVISION PLANS SENT TO FM. INCLUDES OTHER PERMIT NUMBERS RELATED TO REVISION. LOOK ON MAIN PERMIT #10509220. DUPLICATE PERMIT #'S ARE SAME FOR BOTH ROLLS.
10/25/2005 CJR rec'd revision from wjd, put in rejected revision drawer
9/19/2005 CJR returned from fm, now with permitting
8/2/2005 JRG Mike Graham spoke with James, New plans/Ltr from Arch/SoilReportsS&S/ 2ModifiedTruss/3EngShtsGoodAddressEachUnit
5/12/2005 EEC PLANS RETURNED FROM FM