Clearance Sheet C2003-004116*017

Clearance Sheet is Over 180 Days

Contractor: RIGGS, WILLIAM JOSEPH
Unpaid $0.00(); Paid $2,161.00(0781644)
Cert Occ
Proj Name: Parcel:
Prop Use Desc: Prop Use:
Contractor ID: Valuation:

Pre:      Street Num:      Street:      Class:      Post:      Zip  Supplemental:   


Expedited Review Required:   

Permit #Issue DateInfoContractorPaidDueAssocInfo
21600234 1/21/2016 9:31:33 AMU FPL JONES JR, JOHN W.00[ MAIN SERVICE PANEL Amps 400 - ]
31503221 9/21/2015 3:42:21 PM RAVAN, JOHN E.00[ NEW CONSTRUCTION 27 - ]
41507786 12/16/2015 9:58:05 AMA STOVER, MICHAEL EDWARD00[ NEW HVAC Valuation 70012 - ]
61500358 12/15/2015 9:37:34 AMSPKLJOHNSTON, ANDY M00[ SPRINKLER SYSTEM unit 178 - ]
61600016 1/28/2016 12:34:40 PMALRMHALBROOKS, JOHN TYLER00[ FIRE ALARM Devices 49 - ]
11508011 9/11/2015 1:08:12 PM319RIGGS, WILLIAM JOSEPH00 


Log

TypeRcv DtPln Rvwd DtRvwdByStatusCommentOutstanding CommentsPlan Review
FIRE MARSHALL REVIEW6/18/2015 kbarnes6/19/2015 PWebbpwebbRejected New school building 3 Plan Review
BLDG PLAN REVIEWER6/19/2015 PWebb6/22/2015 fbeczafbeczaRejected 0 Plan Review
FIRE RESUB MARSHAL REVIEW7/10/2015 krobshaw7/14/2015 PWebbpwebbRejected Resubmittal 3 Plan Review
BLDG PLAN REVIEWER7/14/2015 PWebb7/16/2015 fbeczafbeczaRejected 0 Plan Review
FIRE RESUB MARSHAL REVIEW7/27/2015 krobshaw7/29/2015 PWebbpwebbRejected 17 Plan Review
BLDG RESUBMIT7/29/2015 PWebb7/30/2015 fbeczafbeczaRejected 0 Plan Review
FIRE RESUB MARSHAL REVIEW9/2/2015 ehumphreys9/10/2015 PWebbpwebbApproved 3 Plan Review
BLDG RESUBMIT9/10/2015 PWebb9/10/2015 fbeczafbeczaApproved 0 Plan Review
FIRE SPRINKLER SYSTEM10/29/2015 brepult11/4/2015 JRuleyjruleyApproved Fire Sprinkler System 0 Plan Review
PENDING PERMIT ISSUES11/3/2015 ddoak11/6/2015 blawblawApproved FEMA U/C--Bldg lays in a x zone per gis 0 Plan Review
FIRE ALARM SYSTEM1/19/2016 edegrande1/26/2016 JRuleyjruleyApproved Extension from existing fire alarm to a new building 0 Plan Review
BLDG REVISION1/21/2016 krobshaw1/21/2016 fbeczafbeczaApproved ELECTRICAL REVISIONS 0 Plan Review
BLDG REVISION1/29/2016 fbecza1/29/2016 fbeczafbeczaApproved change to walkway framing only 0 Plan Review
FIRE MARSHAL REVISION2/9/2016 SMurray2/9/2016 SMurraysmurrayApproved change to walkway framing only 0 Plan Review
BLDG REVISION3/11/2016 lhenry    REVISED ENERGY CALCS 0 Review Pending
FIRE MARSHAL REVISION4/7/2016 ktaing4/13/2016 SMurraysmurrayApproved One hour fire separation between building and walkway.Sent to Stephanie M. 0 Plan Review
BLDG REVISION4/13/2016 SMurray4/13/2016 fbeczafbeczaApproved One hour fire separation between building and walkway. 0 Plan Review
FIRE MARSHAL REVISION5/4/2016 ehumphreys5/5/2016 JRuleyjruleyApproved EXTERIOR DOOR HARDWARE 0 Plan Review
PENDING PERMIT ISSUES5/6/2016 fbecza5/6/2016 fbeczafbeczaApproved panic bar 0 Plan Review


Notes

Note DtNote
7/7/2016 krobshaw

APPROVED EXTERIOR DOOR HARDWARE/ PANIC BAR DETAILS RELEASED TO BILLY RIGGS - NO CHARGE AS PER T. BECZA

4/13/2016 ehumphreys

APPROVED REVISION IN DRAWER

2/9/2016 SMurray

Revision to walkway was not originally routed to the FM office. Bldg reviewer approved and office copy has already been scanned into the system without our approved stamp. The job copy is stamped by our office as approved.

2/1/2016 brepult

APPROVED REVISION IN DRAWER- change to walkway framing only 

1/21/2016 krobshaw

APPROVED ELECTRICAL DETAIL REVISIONS RELEASED TO TERRELL JONES

7/30/2015 edegrande

REJECTED ROLLED PLANS ON SHELF

7/22/2015 edegrande

REJECTED PACKAGE PLANS PICKED UP BY BOB MORGEN

7/17/2015 krobshaw

REJECTED PLAN ON SHELF

7/10/2015 krobshaw

REJECTED PLAN RELEASED TO BOB MORGAN

6/23/2015 krobshaw

REJECTED PLAN ON COMMERCIAL SHELF