Clearance Sheet C2021-008654

Clearance Sheet is Over 180 Days

Contractor: DILLON, MICHAEL C
Unpaid $0.00(); Paid $266,475.50(01693844,1308971)
Proj Name: Parcel:
Prop Use Desc: Prop Use:
Contractor ID: Valuation:

Pre:      Street Num:      Street:      Class:      Post:      Zip  Supplemental:   


Expedited Review Required:   

Permit #Issue DateInfoContractorPaidDueAssocInfo
22311121 1/12/2024 10:02:24 AMU JEA MACDONALD, JAMES ALLEN00[ MAIN SERVICE PANEL Amps 5000 - ]
22311122 1/12/2024 10:02:25 AMU JEA MACDONALD, JAMES ALLEN00[ GENERATOR 1 - GENERATOR 1 - MAIN SERVICE PANEL Amps 5000 - ]
22311123 1/12/2024 10:02:25 AMU JEA MACDONALD, JAMES ALLEN00[ MAIN SERVICE PANEL Amps 2500 - ]
22311124 1/12/2024 10:02:25 AMU JEA MACDONALD, JAMES ALLEN00[ MAIN SERVICE PANEL Amps 2500 - ]
22311127 1/12/2024 10:02:25 AMU JEA MACDONALD, JAMES ALLEN00[ (6) FEEDER SERVICE PANEL Amps 1200 - (3) FEEDER SERVICE PANEL Amps 800 - (3) FEEDER SERVICE PANEL Amps 600 - (24) FEEDER SERVICE PANEL Amps 400 - FEEDER SERVICE PANEL Amps 250 - (50) FEEDER SERVICE PANEL Amps 225 - (59) FEEDER SERVICE PANEL Amps 100 - (4) FEEDER SERVICE PANEL Amps 60 - MAIN SERVICE PANEL Amps 5000 - ]
22400730 1/25/2024 9:12:44 AMJEA4.03 SEAY, JAMES BRIAN00[ TEMPORARY POLE 1 - ]
22400731 1/25/2024 9:14:08 AMJEA4.03 SEAY, JAMES BRIAN00[ TEMPORARY POLE 1 - ]
32404100 7/23/2024 12:08:41 PM JONES, PAUL VERNON JR00[ (2) BACKFLOW PROTECTIVE DEVICE # Unit 2 - NEW CONSTRUCTION 877 - ]
42412226 9/24/2024 12:35:41 PMG JONES, PAUL VERNON JR00[ GAS HVAC Unit 3 - GAS PIPING Outlets 7 - ]
42412246 9/25/2024 9:32:17 AMA JONES, PAUL VERNON JR00[ NEW HVAC Valuation 222135 - NEW HVAC Valuation 9075 - NEW HVAC Valuation 201115 - ]
42508498 7/24/2025 11:10:26 AMH CROFT, JONATHAN E.00[ FIRE HOOD Cnt 3 - ]
62500293 6/18/2025 8:39:25 AMALRMPOURGOLAFSHAN, FARSHID00[ FIRE ALARM Devices 1 - ]
62500322 7/14/2025 10:16:57 AMSUP GREENE, JAMES S00[ FIRE SUPPRESSION SYSTEM Unit 3 - ]
62500412 8/21/2025 10:06:06 AMSPKLSTARLING, DUSTIN00[ SPRINKLER SYSTEM unit 2375 - ]
62500638 12/19/2025 1:16:23 PMALRMBRUGH, LARRY TAYLOR JR00[ FIRE ALARM Devices 22 - ]
62500639 12/19/2025 1:16:23 PMALRMBRUGH, LARRY TAYLOR JR00[ FIRE ALARM Devices 15 - ]
62600129 3/26/2026 5:35:34 PMALRMDUNTZ, RICHARD W00[ FIRE ALARM Devices 1287 - ]
82502083 12/12/2025 1:03:20 PM MALTA, SCOTT00[ SPRINKLER HEADS Units 1908 - ]
12317087 12/14/2023 3:18:00 PM323DILLON, MICHAEL C00 
12504164 4/2/2025 3:42:54 PM435CREGISTER, GARY LINCOLN00 


Log

TypeRcv DtPln Rvwd DtRvwdByStatusCommentOutstanding CommentsPlan Review
FIRE MARSHALL REVIEW2/1/2022 dlyons2/28/2022 PWebbpwebbRejected 52 Plan Review
BLDG PLAN REVIEWER2/28/2022 PWebb3/2/2022 jadamsjadamsRejected spec books on johns desk 1 Plan Review
BLDG PLAN REVIEWER9/5/2023 bmsmith    PLANS WERE NOT ROUTED - Only C21-8654*1 routed for review 0 Review Pending
FIRE RESUB MARSHAL REVIEW11/13/2023 dlyons11/20/2023 PWebbpwebbRejected 1 Plan Review
BLDG PLAN REVIEWER11/29/2023 bmsmith11/30/2023 jadamsjadamsApproved 0 Plan Review
FIRE RESUB MARSHAL REVIEW12/8/2023 RDowling12/8/2023 RDowlingrdowlingApproved letter received with all needed info approved this date with holds added to any other info needed by this office. 1 Plan Review
BLDG RESUBMIT12/8/2023 jcrodriguez12/8/2023 jadamsjadamsApproved 0 Plan Review
 7/30/2024 lnewton8/1/2024 sschnellenbergersschnellenbergerRejected 6 Plan Review
 9/11/2024 dlyons9/24/2024 sschnellenbergersschnellenbergerApproved 0 Plan Review
FIRE MARSHAL REVISION1/2/2025 dlyons2/4/2025 PWebbpwebbRejected structural, plumbing, mech, elect. and misc. revisions submitted 9 Plan Review
FIRE SPRINKLER SYSTEM1/15/2025 lnewton2/11/2025 PWebbpwebbRejected 18 Plan Review
BLDG REVISION2/4/2025 jcrodriguez2/4/2025 jadamsjadamsRejected structural, plumbing, mech, elect. and misc. revisions submitted 1 Plan Review
 3/10/2025 lnewton3/27/2025 PWebbpwebbApproved structural, plumbing, mech, elect. and misc. revisions submitted 0 Plan Review
BLDG REVISION3/28/2025 jcrodriguez3/28/2025 jadamsjadamsApproved structural, plumbing, mech, elect. and misc. revisions submitted 0 Plan Review
FIRE ALARM SYSTEM4/11/2025 lnewton5/6/2025 PWebbpwebbRejected BDA 5 Plan Review
FIRE RESUB SPRINKLER SYSTEM5/8/2025 lnewton6/11/2025 PWebbpwebbRejected 11 Plan Review
FIRE RESUB ALARM SYSTEM5/15/2025 lnewton6/16/2025 RDowlingrdowlingApproved BDA 0 Plan Review
FIRE MARSHAL REVISION5/27/2025 lnewton6/25/2025 PWebbpwebbRejected Removal of A201A1 from the Narrative/See Narrative 7 Plan Review
FIRE ENGINEERED SUPPRESSION6/16/2025 lnewton7/11/2025 RDowlingrdowlingApproved suppresion 0 Plan Review
FIRE HOOD SYSTEM6/24/2025 lnewton7/21/2025 SMurraysmurrayApproved 3 exhaust hoods 0 Plan Review
BLDG REVISION6/26/2025 jcrodriguez6/27/2025 jedwardsjedwardsRejected Removal of A201A1 from the Narrative/See Narrative 4 Plan Review
FIRE RESUB SPRINKLER SYSTEM7/30/2025 lnewton8/20/2025 PWebbpwebbApproved 0 Plan Review
 8/8/2025 lnewton8/26/2025 PWebbpwebbRejected Removal of A201A1 from the Narrative/See Narrative 3 Plan Review
BLDG REVISION8/27/2025 jcrodriguez8/27/2025 jedwardsjedwardsRejected Removal of A201A1 from the Narrative/See Narrative (RESUBMITTAL) 2 Plan Review
FIRE MARSHAL REVISION10/16/2025 lnewton11/3/2025 PWebbpwebbApproved Addressing Hold 109 Smoke Control Permit 0 Plan Review
 10/16/2025 lnewton11/4/2025 PWebbpwebbApproved Removal of A201A1 from the Narrative/See Narrative 0 Plan Review
FIRE ALARM SYSTEM10/17/2025 lnewton11/12/2025 PWebbpwebbRejected 18 Plan Review
BLDG REVISION11/4/2025 jcrodriguez11/5/2025 jedwardsshillyardApproved Addressing Hold 109 Smoke Control Permit 0 Plan Review
BLDG REVISION11/5/2025 jcrodriguez11/5/2025 jedwardsjedwardsApproved Removal of A201A1 from the Narrative/See Narrative (2ND RESUBMITTAL) 0 Plan Review
FIRE ALARM SYSTEM12/4/2025 lnewton12/17/2025 jlhatcherjlhatcherApproved 0 Plan Review
FIRE ALARM SYSTEM12/4/2025 lnewton12/17/2025 lnewtonjlhatcherApproved Pre-Action 0 Plan Review
FIRE MARSHAL REVISION1/30/2026 hsapp2/11/2026 PWebbpwebbApproved SEE ATTACHED NARRATIVE FOR CCD 9&10 0 Plan Review
 2/5/2026 lnewton2/6/2026 jlhatcherjlhatcherApproved REVISION to Remove Backflow 0 Plan Review
BLDG REVISION2/11/2026 bmsmith2/13/2026 jedwardsjedwardsApproved SEE ATTACHED NARRATIVE FOR CCD 9&10 0 Plan Review
FIRE MARSHAL REVISION3/9/2026 lnewton3/23/2026 PWebbpwebbApproved Addressing HOLD for Smoke Control System 0 Plan Review
FIRE RESUB ALARM SYSTEM3/23/2026 PWebb3/24/2026 PWebbpwebbApproved 0 Plan Review
BLDG REVISION3/25/2026 krobshaw3/25/2026 jadamsjadamsApproved Addressing HOLD for Smoke Control System 0 Plan Review
FIRE MARSHAL REVISION6/1/2026 hsapp6/30/2026 jlhatcherjlhatcherApproved HOLD 109 FOR CI FAN AGENT 0 Plan Review
FIRE MARSHAL REVISION6/1/2026 hsapp7/1/2026 PWebbpwebbRejected REVISION: HOLD 109 FOR LAB CHEMICALS; HOLD 109 FOR STAIR SIGANGE 4 Plan Review
PENDING PERMIT ISSUES6/4/2026 mmount6/4/2026 jedwardsjedwardsApproved Hold CO Final Threshold Report 0 Plan Review
FIRE MARSHAL REVISION6/4/2026 lnewton6/25/2026 PWebbpwebbApproved Architectural/Electrical/Mechanical/Fire Protection/Plumbing/Technology 0 Plan Review
FIRE MARSHAL REVISION6/23/2026 hsapp6/24/2026 RDowlingrdowlingApproved Revision: Med Gas Report 0 Plan Review
BLDG REVISION6/25/2026 bmsmith6/29/2026 jadamsjadamsApproved DRAWING REVISION; SEE ATTACHED CCD 11 NARRATIVE 0 Plan Review
BLDG REVISION7/7/2026 bmsmith7/7/2026 jedwardsjedwardsRejected REVISION: HOLD 109 FOR LAB CHEMICALS; HOLD 109 FOR STAIR SIGNAGE 1 Plan Review
FIRE MARSHAL REVISION7/15/2026 lnewton7/17/2026 PWebbpwebbApproved Addressing HOLDS Damper(?)/Med Gas 3rd Party Report 0 Plan Review


Notes

Note DtNote
  Emailed rejected fire comments 2/28/22, routed over to Building for review. DML
  LARGE ROLLED REJECTED PLANS are located on the gray cart in the corner behind station #2.
  Emailed Rejected Fire Review Comments 11/20/2023 - Plans were routed to Bldg Dept 11/28/2023 - Previously held per JAdams as they were awaiting Fires Approval, but directed to send per Fire Plan Reviewers - lln
  APPROVED BY BUILDING; PLANS SENT BACK TO FIRE TO AWAIT REJECTION COMMENTS TO BE ADDRESSED FOR FIRE-BMS
  Received plans back from Bldg Dept 11/30/2023 - Standing next to hall cubby - Re-emailed Rejected Fire Comments - lln
  Plans routed over to Bldg. Dept. 12/8/23 dml
  Emailed rejected underground comments. Plans put in cubby "R" 8/1/24 dml
  Emailed rejected fire revision comments, plans routed over to bldg. dept. 2/4/25 dml
  Emailed rejected Bldg. Dept. comments for revision - Revision routed to Fire 2/5/25 jr
  Received rejected revision back from bldg. dept. plans put in corner by fire exting. cabinet. 2/5/25 dml
  Emailed rejected fire sprinkler comments, plans put in cubby "S" 2/12/25 dml
  Emailed approved fire revision comments. Plans routed over to bldg. dept. 3/28/25 dml
  EMAILED APPROVED REVISION READY FOR PICK UP; IN BREEZYS OFFICE DUE TO SIZE-BMS 03/31/2025
  Emailed Rejected Fire Comments for BDA 5/6/2025 - Cubby "108" - lln
  ***FEES PAID FOR MAJOR REVSIONS APPROVED 3/28/25*** - PLANS STILL IN BREEZY'S OFFICE FOR PICK UP!!!!
  Emailed Rejected Fire Comments for Sprinkler 6/13/2025 - Back Hallway "Fire Extinquisher" - lln
  Emailed Rejected Fire Comments for Revision 6/26/2025 - Revision routed to bldg. Dept - lln
  EMAILED REJECTED REVISION COMMENTS FROM BLDG-PLANS SENT BACK TO FIRE ET
  Received Rejected Revision back from bldg. dept 6/27/2025 - Plans in Back Hallway - lln
  Emailed Rejected Fire Comments for Revision 8/27/2025 - Revision routed to Bldg Dept - lln
  E-MAILED REJECTION COMMENTS- REJECTED REVISION ROUTED BACK TO FIRE
  Received Plans back from bldg. dept 8/27/2025 - Back Hallway - lln
  Emailed approved fire revision comments. Plans routed over to bldg. dept. 11/4/25 hs
  E-MAILED APPROVAL- APPROVED REVISION ON THE DESK AT STATION 9 UNDER DILLON- 11/5/25 AH
  emailed revision ready- put with other revision on STATION 9
  Emailed rejected fire alarm comments, plans put in cubby "D" 11/12/25- hs
  Emailed approved fire revision comments. Plans routed over to bldg. dept. 2/11/26- hs
  APPROVED REVISION AT STATION 9.//EMAILED UPDATE
  Emailed Approved Fire Comments for Revision 3/24/26 - Plans routed to Bldg Dept - hs
  E-MAILED APPROVAL- APPROVED REVISION IN APPROVED REVISION CABINET ON BOTTOM SHELF UNDER DILLON
  Emailed Approved Fire Comments for Revision 6/25/26 - Plans routed to Bldg Dept - hs
  EMAILED REVISION READY FOR PICK-UP; EXTREMELY LARGE SET OF PLANS- PLACED IN COMMERCIAL OVERFLOW NEXT TO CON LICEN PRINTER UNDER -DILLON-
  EMAILED COMMENTS; LEFT FOR FIRE
  Received Revision addressing Chemicals & Signage back from bldg. dept 7/9/2026 - Cubby "3" -lln