SJC Home
Permit # 82204695
ELLIS III, JOHN ELLSWORTH
Permit #AprvDescSchedDtInspDtResultRemarks
82204695-805 IRRGTN 1/20/2023 1/20/2023 A NAZARIO, EDGAR R-
42210962-408 GASFNL 1/20/2023 1/20/2023 A -
42211080-403 MC FNL 1/20/2023 1/20/2023 A -
32203080-304 PL FNL 1/20/2023 1/20/2023 A -
22210993-204 EL FNL 1/20/2023 1/20/2023 A -
12203101-125 BL FNL 1/20/2023 1/20/2023 A -
82204695-805 IRRGTN 12/27/2022 12/22/2022 C -
42210962-408 GASFNL 12/27/2022 12/22/2022 C -
42211080-403 MC FNL 12/27/2022 12/22/2022 C -
32203080-304 PL FNL 12/27/2022 12/22/2022 C -
22210993-204 EL FNL 12/27/2022 12/22/2022 C -
12203101-125 BL FNL 12/27/2022 12/22/2022 C -
22210993-213 MTR CN 12/1/2022 12/1/2022 A -12/1 mb - review lathing placement and fastening for stucco accents. All per plan and code. Also review requirements for meter can and early power. Scott to have electrician place lock-out breaker for air handler. Meter correct and safe, panel all blocked out except 3 breakers, and SJC standard
12203101-108 LTH NL 12/1/2022 12/1/2022 A -12/1 mb - review lathing placement and fastening for stucco accents. All per plan and code. Also review requirements for meter can and early power. Scott to have electrician place lock-out breaker for air handler. Meter correct and safe, panel all blocked out except 3 breakers, and SJC standard
22210993-213 MTR CN 11/23/2022 11/23/2022 D -Attempted to perform a meter can check per protocol: This site is not ready for the following reasons: 1. no addressing posted 2. AC system is not trimmed out to include condenser disconnects. 3. Open blank space in breaker panel. Results: not past
12203101-109 INSULA 10/24/2022 10/24/2022 A -
42210962-407 GS RGH 10/17/2022 10/17/2022 A -10/17 mb - review complete rough- mechanical HVAC, mechanical gas, electric, plumbing, framing, and fire caulk. All per plan and code. Result Pass. Please add 131 dry in- zip sheathing taped, windows and doors flashed, fastened, and taped. Result Pass
42211080-401 MC RGH 10/17/2022 10/17/2022 A -10/17 mb - review complete rough- mechanical HVAC, mechanical gas, electric, plumbing, framing, and fire caulk. All per plan and code. Result Pass. Please add 131 dry in- zip sheathing taped, windows and doors flashed, fastened, and taped. Result Pass
32203080-303 RGH PL 10/17/2022 10/17/2022 A -10/17 mb - review complete rough- mechanical HVAC, mechanical gas, electric, plumbing, framing, and fire caulk. All per plan and code. Result Pass. Please add 131 dry in- zip sheathing taped, windows and doors flashed, fastened, and taped. Result Pass
22210993-203 RGH EL 10/17/2022 10/17/2022 A -10/17 mb - review complete rough- mechanical HVAC, mechanical gas, electric, plumbing, framing, and fire caulk. All per plan and code. Result Pass. Please add 131 dry in- zip sheathing taped, windows and doors flashed, fastened, and taped. Result Pass
12203101-131 WINDOW 10/17/2022 10/17/2022 A -10/17 mb - review complete rough- mechanical HVAC, mechanical gas, electric, plumbing, framing, and fire caulk. All per plan and code. Result Pass. Please add 131 dry in- zip sheathing taped, windows and doors flashed, fastened, and taped. Result Pass
12203101-105 FRAMNG 10/17/2022 10/17/2022 A -10/17 mb - review complete rough- mechanical HVAC, mechanical gas, electric, plumbing, framing, and fire caulk. All per plan and code. Result Pass. Please add 131 dry in- zip sheathing taped, windows and doors flashed, fastened, and taped. Result Pass
12203101-100 CM RGH 10/17/2022 10/17/2022 A -
12203101-106 RF D&T 8/10/2022 8/12/2022 A -08/10 mb review all straps and ties and dry in. All per structural plans and code. Please result 206 pass. Also review dry in. Windows in and secure, doors are not in. Walls are dried in except for windows. Roof is dry in. Result dry in as Partial Pass so that shingling can commence.
12203101-106 RF D&T 7/27/2022 7/27/2022 C -07/27 mb - review roof and wall sheathing placement and nailing. Result 107 wall sheathing Pass; result 116 roof sheathing Pass. 110 rated wall was partial on 6/15 and should have been passed on 6/22. Note 106 roof deck and ties not ready today.
12203101-116 RF SHT 7/27/2022 7/27/2022 A -07/27 mb - review roof and wall sheathing placement and nailing. Result 107 wall sheathing Pass; result 116 roof sheathing Pass. 110 rated wall was partial on 6/15 and should have been passed on 6/22. Note 106 roof deck and ties not ready today.
12203101-107 SHTHNG 7/27/2022 7/27/2022 A -07/27 mb - review roof and wall sheathing placement and nailing. Result 107 wall sheathing Pass; result 116 roof sheathing Pass. 110 rated wall was partial on 6/15 and should have been passed on 6/22. Note 106 roof deck and ties not ready today.
12203101-110 FIRE W 6/23/2022 6/22/2022 A -06/22 mb review rated wall nail off for section above top plate. Result partial Pass
12203101-120 P FIRE 6/15/2022 6/15/2022 A -06/15 mb - review below top plate rated wall between sides of duplex. Result partial pass…as additional stages of rated wall completion are necessary.
12203101-102 SLAB.. 5/19/2022 5/18/2022 A -mb review prep for slab, all per plan and spec- result pass.
32203080-301 U/SLAB 5/13/2022 5/16/2022 A -review under slab plumbing. All in place, hot/cold is, ac chase below footing. Result Pass