82203339-805 IRRGTN 10/19/2022 10/20/2022 A NAZARIO, EDGAR R-10/19 mb review for all finals: mech HVAC, mech gas, plumbing, and electric. All complete and all per plan and code. Results pass
42202900-408 GASFNL 10/19/2022 10/20/2022 A -10/19 mb review for all finals: mech HVAC, mech gas, plumbing, and electric. All complete and all per plan and code. Results pass
42203503-403 MC FNL 10/19/2022 10/20/2022 A -10/19 mb review for all finals: mech HVAC, mech gas, plumbing, and electric. All complete and all per plan and code. Results pass
32200631-304 PL FNL 10/19/2022 10/20/2022 A -10/19 mb review for all finals: mech HVAC, mech gas, plumbing, and electric. All complete and all per plan and code. Results pass
22207852-204 EL FNL 10/19/2022 10/20/2022 A -10/19 mb review for all finals: mech HVAC, mech gas, plumbing, and electric. All complete and all per plan and code. Results pass
12119254-125 BL FNL 10/19/2022 10/20/2022 A -10/19 mb review for all finals: mech HVAC, mech gas, plumbing, and electric. All complete and all per plan and code. Results pass
22207852-213 MTR CN 8/3/2022 8/4/2022 A -08/03 mb- review for meter can in order to power up ac units. Meter set up all ok per code. All slots blanked out in panel except for one 110 ckt and the ac units. All of those circuits are safety off. Result Pass.
12119254-118 P LATH 6/20/2022 6/21/2022 A -
12119254-109 INSULA 6/10/2022 6/13/2022 A -
42202900-407 GS RGH 6/2/2022 6/3/2022 A -06/02 mb- review complete rough- all MEP and dry-in complete- result complete rough: pass with following note: transom windows on back order, and will be reviewed at insulation inspection.
42203503-401 MC RGH 6/2/2022 6/3/2022 A -06/02 mb- review complete rough- all MEP and dry-in complete- result complete rough: pass with following note: transom windows on back order, and will be reviewed at insulation inspection.
32200631-303 RGH PL 6/2/2022 6/3/2022 A -06/02 mb- review complete rough- all MEP and dry-in complete- result complete rough: pass with following note: transom windows on back order, and will be reviewed at insulation inspection.
12119254-131 WINDOW 6/2/2022 6/3/2022 A -6/02 mb- review complete rough- all MEP and dry-in complete- result complete rough: pass with following note: transom windows on back order, and will be reviewed at insulation inspection.
12119254-105 FRAMNG 6/2/2022 6/3/2022 C -
12119254-100 CM RGH 6/2/2022 6/3/2022 A -06/02 mb- review complete rough- all MEP and dry-in complete- result complete rough: pass with following note: transom windows on back order, and will be reviewed at insulation inspection.
12119254-106 RF D&T 5/5/2022 5/6/2022 A -05/05 mb- review plans and site with Rob White. Result 106 Roof, Deck and Ties- Pass
12119254-116 RF SHT 4/22/2022 4/22/2022 A -review plans, truss details, and site with Rob White. Today’s inspection is for roof and wall sheathing nailing. This is the first inspection on this house, and the first of many to come on houses in progress. Thus considerable discussion about process, various inspections, product approval codes,
12119254-117 P WLLS 4/22/2022 4/22/2022 A -review plans, truss details, and site with Rob White. Today’s inspection is for roof and wall sheathing nailing. This is the first inspection on this house, and the first of many to come on houses in progress. Thus considerable discussion about process, various inspections, product approval codes,