|
82202956-805
| IRRGTN |
9/26/2022
|
9/26/2022
| A |
NAZARIO, EDGAR R-
|
|
42201283-408
| GASFNL |
9/26/2022
|
9/26/2022
| A |
-
|
|
42201764-403
| MC FNL |
9/26/2022
|
9/26/2022
| A |
-
|
|
32108062-304
| PL FNL |
9/26/2022
|
9/26/2022
| A |
-
|
|
22201258-204
| EL FNL |
9/26/2022
|
9/26/2022
| A |
-
|
|
12117484-125
| BL FNL |
9/26/2022
|
9/26/2022
| A |
-
|
|
22201258-213
| MTR CN |
7/22/2022
|
7/22/2022
| A |
-eview house for meter can in order to powerAC. Meter panel check, breaker panel all breakers connections sealed except for 1 110 circuit in laundry and the circuits for ac condensing unit and air handler. 213 result pass
|
|
12117484-109
| INSULA |
5/24/2022
|
5/25/2022
| A |
-eview insulation; Result Pass
|
|
42201283-407
| GS RGH |
4/29/2022
|
4/28/2022
| A |
-SJC - this complete rough inspection includes top out plumbing, rough elec, and rough HVAC. Also review all penetrations between floors or to attic sealed. Bath exhaust vents in and sealed. Zip tie sheathing not completely taped…review with pictures and next inspection. Result -Pass.
|
|
42201764-401
| MC RGH |
4/29/2022
|
4/28/2022
| A |
-SJC - this complete rough inspection includes top out plumbing, rough elec, and rough HVAC. Also review all penetrations between floors or to attic sealed. Bath exhaust vents in and sealed. Zip tie sheathing not completely taped…review with pictures and next inspection. Result -Pass.
|
|
32108062-303
| RGH PL |
4/29/2022
|
4/28/2022
| A |
-SJC - this complete rough inspection includes top out plumbing, rough elec, and rough HVAC. Also review all penetrations between floors or to attic sealed. Bath exhaust vents in and sealed. Zip tie sheathing not completely taped…review with pictures and next inspection. Result -Pass.
|
|
22201258-203
| RGH EL |
4/29/2022
|
5/4/2022
| A |
-
|
|
12117484-131
| WINDOW |
4/29/2022
|
4/28/2022
| A |
-SJC - this complete rough inspection includes top out plumbing, rough elec, and rough HVAC. Also review all penetrations between floors or to attic sealed. Bath exhaust vents in and sealed. Zip tie sheathing not completely taped…review with pictures and next inspection. Result -Pass.
|
|
12117484-105
| FRAMNG |
4/29/2022
|
4/28/2022
| A |
-SJC - this complete rough inspection includes top out plumbing, rough elec, and rough HVAC. Also review all penetrations between floors or to attic sealed. Bath exhaust vents in and sealed. Zip tie sheathing not completely taped…review with pictures and next inspection. Result -Pass.
|
|
12117484-100
| CM RGH |
4/29/2022
|
4/28/2022
| A |
-SJC - this complete rough inspection includes top out plumbing, rough elec, and rough HVAC. Also review all penetrations between floors or to attic sealed. Bath exhaust vents in and sealed. Zip tie sheathing not completely taped…review with pictures and next inspection. Result -Pass.
|