Permit #AprvDescSchedDtInspDtResultRemarks
32201961-304 PL FNL 12/1/2023 12/1/2023 A -
22107842-204 EL FNL 12/1/2023 12/1/2023 A -
12112332-125 BL FNL 12/1/2023 12/1/2023 A -
42214213-408 GASFNL 11/28/2023 11/28/2023 A MARVEL, ROBERT E-
42211208-403 MC FNL 11/28/2023 11/28/2023 A MARVEL, ROBERT E-
32201961-304 PL FNL 11/28/2023 11/28/2023 D -
22107842-204 EL FNL 11/28/2023 11/28/2023 D -
12112332-125 BL FNL 11/28/2023 11/28/2023 D -Provide GFCI protection at outlet by water heater. Provide arc shields at kitchen island. Smoke detector at top of stairs has no power. Smoke detector outside small bedroom second floor is not wired correctly.
22107842-213 MTR CN 8/10/2023 8/10/2023 A -
12112332-109 INSULA 12/30/2022 12/30/2022 A -
32201961-303 RGH PL 12/14/2022 12/14/2022 A -
22107842-203 RGH EL 12/14/2022 12/14/2022 A -
12112332-105 FRAMNG 12/14/2022 12/14/2022 A -
12112332-100 CM RGH 12/14/2022 12/14/2022 A -
32201961-303 RGH PL 12/7/2022 12/7/2022 D -
22107842-203 RGH EL 12/7/2022 12/7/2022 D -
12112332-105 FRAMNG 12/7/2022 12/7/2022 D -
12112332-100 CM RGH 12/7/2022 12/7/2022 D -Meeting for inspection list
42214213-407 GS RGH 12/2/2022 12/2/2022 A MARVEL, ROBERT E-
42211208-401 MC RGH 12/2/2022 12/2/2022 A MARVEL, ROBERT E-
32201961-303 RGH PL 12/2/2022 12/2/2022 D -
22107842-203 RGH EL 12/2/2022 12/2/2022 D -
12112332-105 FRAMNG 12/2/2022 12/2/2022 D -
12112332-100 CM RGH 12/2/2022 12/2/2022 D -file:///var/mobile/Library/SMS/Attachments/fd/13/DBFA7077-5C38-4B53-BEE2-551E07D63E9B/Twent%20second%20st.png
42214213-407 GS RGH 11/8/2022 11/8/2022 D MARVEL, ROBERT E-
42211208-401 MC RGH 11/8/2022 11/8/2022 D MARVEL, ROBERT E-
32201961-303 RGH PL 11/8/2022 11/8/2022 D -
22107842-203 RGH EL 11/8/2022 11/8/2022 D -
12112332-105 FRAMNG 11/8/2022 11/8/2022 D -
12112332-100 CM RGH 11/8/2022 11/8/2022 D -611 twenty second st 1. Provide gas bond. 2. Missing fire foam/blocking multiple locations. 3. Missing multiple nail plates on plumbing. 4. Provide straps on electro cable within 12” of panel/enclosures/ boxes. 5. SER cable needs to be extended to exterior. 6. Need to test bath tub. Drains are
12112332-131 WINDOW 11/1/2022 11/1/2022 A -
12112332-106 RF D&T 7/14/2022 7/18/2022 A -
12112332-106 RF D&T 7/7/2022 7/7/2022 D -see notes on plans
12112332-130 P R TI 7/7/2022 7/7/2022 A -
12112332-106 RF D&T 7/5/2022 7/5/2022 D -no structural plans
12112332-130 P R TI 7/5/2022 7/5/2022 D -no structural plans
12112332-130 P R TI 6/16/2022 6/16/2022 C -
12112332-116 RF SHT 6/16/2022 6/16/2022 A -
12112332-107 SHTHNG 6/16/2022 6/16/2022 A -
12112332-102 SLAB.. 4/20/2022 4/20/2022 A -
32201961-301 U/SLAB 3/29/2022 3/29/2022 A -
12112332-111 P FNDT 3/10/2022 3/10/2022 A -
12112332-000 INFO.. 2/23/2022 2/22/2022 A -
12112332-111 P FNDT 12/29/2021 12/29/2021 A -
12112332-111 P FNDT 12/3/2021 12/3/2021 D -missing #5 at mid point of all cmu walls per revised detail. add clean outs at all rebar on block wall over 5'
12112332-111 P FNDT 10/4/2021 10/4/2021 A -
12112332-101 FND/FT 9/29/2021 9/29/2021 A -
22107842-205 TMP PL 8/27/2021 8/27/2021 A -