Permit # 42211738
KUSHNER, RICHARD G
Permit #AprvDescSchedDtInspDtResultRemarks
32201777-304 PL FNL 12/22/2022 12/22/2022 A -
22206297-204 EL FNL 12/22/2022 12/22/2022 A -
12203845-125 BL FNL 12/22/2022 12/22/2022 A -
82204073-805 IRRGTN 12/20/2022 12/20/2022 A -
42211738-408 GASFNL 12/20/2022 12/20/2022 A COLASANTI, JOSEPH-
42210311-403 MC FNL 12/20/2022 12/20/2022 A COLASANTI, JOSEPH-
32201777-304 PL FNL 12/20/2022 12/20/2022 D -
22206297-204 EL FNL 12/20/2022 12/20/2022 D -
12203845-125 BL FNL 12/20/2022 12/20/2022 D -check notes
82204073-805 IRRGTN 12/16/2022 12/16/2022 C -
42211738-408 GASFNL 12/16/2022 12/16/2022 C COLASANTI, JOSEPH-
42210311-403 MC FNL 12/16/2022 12/16/2022 C COLASANTI, JOSEPH-
32201777-304 PL FNL 12/16/2022 12/16/2022 C -
22206297-204 EL FNL 12/16/2022 12/16/2022 C -
12203845-125 BL FNL 12/16/2022 12/16/2022 C -
12203845-108 LTH NL 11/4/2022 11/4/2022 C -no lathe installed
42211738-408 GASFNL 11/2/2022 11/2/2022 C COLASANTI, JOSEPH-
42210311-403 MC FNL 11/2/2022 11/2/2022 C COLASANTI, JOSEPH-
32201777-304 PL FNL 11/2/2022 11/2/2022 C -
22206297-204 EL FNL 11/2/2022 11/2/2022 C -
12203845-125 BL FNL 11/2/2022 11/2/2022 C -not ready for final
12203845-109 INSULA 10/13/2022 10/13/2022 A -
22206297-213 MTR CN 10/10/2022 10/10/2022 A -
12203845-109 INSULA 9/23/2022 9/23/2022 C -
42210311-401 MC RGH 9/9/2022 9/9/2022 A COLASANTI, JOSEPH-
12203845-105 FRAMNG 9/9/2022 9/9/2022 A -
12203845-100 CM RGH 9/9/2022 9/9/2022 A -
12203845-106 RF D&T 9/9/2022 9/9/2022 A -
12203845-130 P R TI 9/8/2022 9/8/2022 A -
12203845-116 RF SHT 9/8/2022 9/8/2022 A -
12203845-106 RF D&T 9/6/2022 9/6/2022 D -Plans damaged, wet and not readable.
42211738-407 GS RGH 9/6/2022 9/6/2022 A LAMM, JEFFREY CLELAND-
42210311-401 MC RGH 9/6/2022 9/6/2022 D LAMM, JEFFREY CLELAND-Exhaust fan duct installed below floor stiffner in middle bathroom. 4"duct in 1/2" space.
32201777-303 RGH PL 9/6/2022 9/6/2022 A -
22206297-203 RGH EL 9/6/2022 9/6/2022 A -
12203845-131 WINDOW 9/6/2022 9/6/2022 A -
12203845-105 FRAMNG 9/6/2022 9/6/2022 D -Plans and permit documents damaged, wet and un-readable.
12203845-100 CM RGH 9/6/2022 9/6/2022 D -Notes need to be corrected/completed.
42211738-407 GS RGH 9/2/2022 9/2/2022 C COLASANTI, JOSEPH-
42210311-401 MC RGH 9/2/2022 9/2/2022 C COLASANTI, JOSEPH-
32201777-303 RGH PL 9/2/2022 9/2/2022 C -
22206297-203 RGH EL 9/2/2022 9/2/2022 C -
12203845-131 WINDOW 9/2/2022 9/2/2022 C -
12203845-105 FRAMNG 9/2/2022 9/2/2022 C -
12203845-100 CM RGH 9/2/2022 9/2/2022 C -
12203845-106 RF D&T 9/2/2022 9/2/2022 D -no plans need to check 106 items, 106 needs to pass before 100 inspection
12203845-106 RF D&T 8/22/2022 8/22/2022 D -Work not done...need dry plans
12203845-106 RF D&T 7/7/2022 7/7/2022 D -check notes circled on plans
12203845-107 SHTHNG 6/28/2022 6/28/2022 A -
12203845-107 SHTHNG 6/27/2022 6/27/2022 D -PREV NOTES NOT COMPLETED
12203845-130 P R TI 6/15/2022 6/15/2022 A -
12203845-116 RF SHT 6/15/2022 6/15/2022 A -ok to shingle
12203845-107 SHTHNG 6/15/2022 6/15/2022 D -check notes
32201777-302 TOPOUT 6/2/2022 6/2/2022 A -
12203845-102 SLAB.. 5/4/2022 5/4/2022 A -
12203845-102 SLAB.. 4/8/2022 4/8/2022 C -
32201777-301 U/SLAB 4/6/2022 4/6/2022 A -