82204063-805
| IRRGTN |
1/18/2023
|
1/19/2023
| A |
-
|
|
42211524-408
| GASFNL |
1/18/2023
|
1/19/2023
| A |
MARVEL, ROBERT E-
|
|
42210940-403
| MC FNL |
1/18/2023
|
1/19/2023
| A |
MARVEL, ROBERT E-
|
|
32202921-304
| PL FNL |
1/18/2023
|
1/19/2023
| A |
-
|
|
22209017-204
| EL FNL |
1/18/2023
|
1/19/2023
| A |
-
|
|
12206109-125
| BL FNL |
1/18/2023
|
1/19/2023
| A |
-
|
|
22209017-213
| MTR CN |
12/14/2022
|
12/14/2022
| A |
-
|
|
12206109-109
| INSULA |
10/27/2022
|
10/28/2022
| A |
-
|
|
12206109-108
| LTH NL |
10/27/2022
|
10/26/2022
| A |
-
|
|
42210940-401
| MC RGH |
10/12/2022
|
10/12/2022
| A |
MARVEL, ROBERT E-
|
|
32202921-303
| RGH PL |
10/12/2022
|
10/12/2022
| A |
-
|
|
22209017-203
| RGH EL |
10/12/2022
|
10/12/2022
| A |
-
|
|
12206109-105
| FRAMNG |
10/12/2022
|
10/12/2022
| A |
-
|
|
12206109-100
| CM RGH |
10/12/2022
|
10/12/2022
| A |
-
|
|
42211524-407
| GS RGH |
10/10/2022
|
10/10/2022
| A |
MARVEL, ROBERT E-
|
|
42210940-401
| MC RGH |
10/10/2022
|
10/10/2022
| D |
MARVEL, ROBERT E-
|
|
32202921-303
| RGH PL |
10/10/2022
|
10/10/2022
| D |
-
|
|
22209017-203
| RGH EL |
10/10/2022
|
10/10/2022
| D |
-
|
|
12206109-105
| FRAMNG |
10/10/2022
|
10/10/2022
| D |
-
|
|
12206109-100
| CM RGH |
10/10/2022
|
10/10/2022
| D |
-30 Clifton Bay 100- missing nail plates. Fix exhaust duct at master bath. Add receptacle in master bedroom. NM cable at 2nd floor is nail outside of wall. All marked with orange paint.
Ok to insulate. Fire block/foam at duct chase on second floor.
|
|
12206109-131
| WINDOW |
10/10/2022
|
10/7/2022
| A |
-
|
|
12206109-106
| RF D&T |
10/5/2022
|
10/5/2022
| A |
-check detail A/S-7 at 100
|
|
12206109-107
| SHTHNG |
9/15/2022
|
9/16/2022
| A |
-
|
|
12206109-106
| RF D&T |
9/15/2022
|
9/16/2022
| D |
-check notes
|
|
12206109-106
| RF D&T |
8/17/2022
|
8/17/2022
| C |
-
|
|
12206109-107
| SHTHNG |
8/17/2022
|
8/17/2022
| D |
-heels need to be per detail SD-8
|
|
12206109-130
| P R TI |
8/9/2022
|
8/9/2022
| A |
-
|
|
12206109-107
| SHTHNG |
8/9/2022
|
8/9/2022
| D |
-nail truss heels per detail
|
|
12206109-130
| P R TI |
8/4/2022
|
8/4/2022
| D |
-strap openings per N/SD-5
|
|
12206109-116
| RF SHT |
8/4/2022
|
8/4/2022
| A |
-
|
|
12206109-107
| SHTHNG |
8/4/2022
|
8/4/2022
| D |
-nail 6 pack of nails in each side of headers per detail N/sd-5
|
|
32202921-302
| TOPOUT |
8/2/2022
|
8/2/2022
| A |
-
|
|
12206109-130
| P R TI |
7/26/2022
|
7/26/2022
| D |
-strap windows on left side of house where sheathing splice is smaller than allowable
|
|
12206109-116
| RF SHT |
7/26/2022
|
7/26/2022
| D |
-multiple loose locations
|
|
12206109-107
| SHTHNG |
7/26/2022
|
7/26/2022
| D |
-6 nails at each end of headers
|
|
12206109-102
| SLAB.. |
6/2/2022
|
6/2/2022
| A |
-
|
|
32202921-301
| U/SLAB |
5/17/2022
|
5/17/2022
| A |
-
|