|
82202957-805
| IRRGTN |
10/19/2022
|
10/20/2022
| A |
-
|
|
42202469-408
| GASFNL |
10/19/2022
|
10/20/2022
| A |
NAZARIO, EDGAR R-10/19 mb review for all finals: mech HVAC, mech gas, plumbing, and electric. All complete and all per plan and code. Results pass
|
|
42203234-403
| MC FNL |
10/19/2022
|
10/20/2022
| A |
NAZARIO, EDGAR R-10/19 mb review for all finals: mech HVAC, mech gas, plumbing, and electric. All complete and all per plan and code. Results pass
|
|
32107869-304
| PL FNL |
10/19/2022
|
10/20/2022
| A |
-
|
|
22206392-204
| EL FNL |
10/19/2022
|
10/20/2022
| A |
-10/19 mb review for all finals: mech HVAC, mech gas, plumbing, and electric. All complete and all per plan and code. Results pass
|
|
12119256-125
| BL FNL |
10/19/2022
|
10/20/2022
| A |
-
|
|
22206392-213
| MTR CN |
7/22/2022
|
7/22/2022
| A |
-On 7/8 we partial passed ceiling cover using code 210 for partial rough. Today review added area (west wing) for ceiling coverup of electric and HVAC. 80% complete, but still partial pass as remaining work includes: fire alarm wiring, security wiring, much of the low voltage from switches to LED
|
|
12119256-108
| LTH NL |
5/19/2022
|
5/19/2022
| A |
-108 lathe and nailing inspection. Placed and staples per code, corner bead and edges secure, no penetrations except porch lights. Result-pass
|
|
12119256-109
| INSULA |
5/11/2022
|
5/11/2022
| A |
-05/10 mb- review site with Rob White. 109 insulation - pass
|
|
42202469-407
| GS RGH |
4/27/2022
|
4/28/2022
| A |
NAZARIO, EDGAR R-SJC - this complete rough inspection includes top out plumbing, rough elec, and rough HVAC. Also review all penetrations between floors or to attic sealed. Bath exhaust vents in and sealed. Zip sheathing completely taped. Result -Pass.
|
|
42203234-401
| MC RGH |
4/27/2022
|
4/28/2022
| A |
NAZARIO, EDGAR R-SJC - this complete rough inspection includes top out plumbing, rough elec, and rough HVAC. Also review all penetrations between floors or to attic sealed. Bath exhaust vents in and sealed. Zip sheathing completely taped. Result -Pass.
|
|
32107869-303
| RGH PL |
4/27/2022
|
4/28/2022
| A |
-SJC - this complete rough inspection includes top out plumbing, rough elec, and rough HVAC. Also review all penetrations between floors or to attic sealed. Bath exhaust vents in and sealed. Zip sheathing completely taped. Result -Pass.
|
|
12119256-131
| WINDOW |
4/27/2022
|
4/28/2022
| A |
-SJC - this complete rough inspection includes top out plumbing, rough elec, and rough HVAC. Also review all penetrations between floors or to attic sealed. Bath exhaust vents in and sealed. Zip sheathing completely taped. Result -Pass.
|
|
12119256-105
| FRAMNG |
4/27/2022
|
4/28/2022
| A |
-SJC - this complete rough inspection includes top out plumbing, rough elec, and rough HVAC. Also review all penetrations between floors or to attic sealed. Bath exhaust vents in and sealed. Zip sheathing completely taped. Result -Pass.
|
|
12119256-100
| CM RGH |
4/27/2022
|
4/28/2022
| A |
-SJC - this complete rough inspection includes top out plumbing, rough elec, and rough HVAC. Also review all penetrations between floors or to attic sealed. Bath exhaust vents in and sealed. Zip sheathing completely taped. Result -Pass.
|
|
12119256-106
| RF D&T |
3/11/2022
|
3/11/2022
| A |
-
|