82201730-805
| IRRGTN |
6/17/2022
|
6/17/2022
| A |
-
|
|
42200793-403
| MC FNL |
6/17/2022
|
6/17/2022
| A |
MARVEL, ROBERT E-
|
|
32106118-304
| PL FNL |
6/17/2022
|
6/17/2022
| A |
-
|
|
22109210-204
| EL FNL |
6/17/2022
|
6/17/2022
| A |
-
|
|
12114600-125
| BL FNL |
6/17/2022
|
6/17/2022
| A |
-
|
|
22109210-204
| EL FNL |
6/15/2022
|
6/15/2022
| C |
-
|
|
42200793-403
| MC FNL |
6/15/2022
|
6/15/2022
| C |
-
|
|
12114600-120
| P FIRE |
6/14/2022
|
6/14/2022
| A |
-drywall fastening duct shaftwall 2nd and 3rd level.
|
|
42200793-405
| P MECH |
6/13/2022
|
6/13/2022
| A |
MARVEL, ROBERT E-
|
|
22109210-210
| P RGHN |
6/13/2022
|
6/13/2022
| A |
-
|
|
12114600-110
| FIRE W |
6/8/2022
|
6/7/2022
| C |
-partial pass. 3rd level and 2nd level shaft wall screw off (dens)
|
|
22109210-210
| P RGHN |
6/2/2022
|
6/3/2022
| A |
-
|
|
12114600-115
| P FRMG |
6/2/2022
|
6/1/2022
| C |
-
|
|
22109210-210
| P RGHN |
6/2/2022
|
6/1/2022
| C |
-
|
|
22109210-203
| RGH EL |
5/16/2022
|
5/16/2022
| A |
-RTU hook up.
|
|
22109210-213
| MTR CN |
5/11/2022
|
5/13/2022
| A |
-
|
|
32106118-302
| TOPOUT |
4/29/2022
|
4/29/2022
| A |
-
|
|
12114600-120
| P FIRE |
4/27/2022
|
4/27/2022
| A |
-drywall screw off for elevator entry walls and stairs adjacent to elevators.
|
|
12114600-120
| P FIRE |
4/22/2022
|
4/22/2022
| A |
-shaftliner at elevator door walls all levels.
|
|
32106118-308
| P RGH. |
4/18/2022
|
4/19/2022
| A |
-
|
|
12114600-115
| P FRMG |
4/5/2022
|
4/4/2022
| A |
-entry canopy framing
|
|
22109210-210
| P RGHN |
3/31/2022
|
3/31/2022
| A |
- Canopy and I.T. Rooms.
|
|
12114600-000
| INFO.. |
3/21/2022
|
3/18/2022
| A |
-Rain leaders from floor to roof.
|
|
32106118-308
| P RGH. |
3/21/2022
|
3/18/2022
| A |
-DWV from 1st floor to roof. She’ll permit. Includes bathrooms.
|
|
12114600-120
| P FIRE |
3/21/2022
|
3/21/2022
| A |
-corridor drywall fastening all levels.
|
|
22109210-210
| P RGHN |
3/10/2022
|
3/11/2022
| A |
-Partial corridors only walls all 3 floors
|
|
12114600-120
| P FIRE |
3/2/2022
|
3/2/2022
| A |
-drywall screw off 1st floor corridors down approximately 6'from top of wall
|
|
42200793-401
| MC RGH |
2/25/2022
|
2/25/2022
| A |
BOYLE, MICHAEL-Duct Seal MOB Building
|
|
12114600-120
| P FIRE |
2/23/2022
|
2/24/2022
| A |
-shaft liner and 1st layer of drywall elevators 2nd and 3rd levels.
|
|
12114600-115
| P FRMG |
2/23/2022
|
2/24/2022
| A |
-shaft framing 3 sides of elevator 2nd and 3rd levels.
|
|
12114600-115
| P FRMG |
2/16/2022
|
2/17/2022
| A |
-remaining window pan fasteners 1st floor
|
|
12114600-102
| SLAB.. |
2/9/2022
|
2/9/2022
| C |
-1/2 of slab on grade (West half of project). Only cancelled since it should have been partial slab inspection.
|
|
12114600-105
| FRAMNG |
2/2/2022
|
2/3/2022
| C |
-Partial Pass - 2nd and 3rd levels interior shell framing ok.
|
|
12114600-131
| WINDOW |
2/2/2022
|
2/3/2022
| C |
-Partial pass - North elevation window sill fasteners for smaller "A" windows only 2nd and 3rd levels
|
|
12114600-115
| P FRMG |
2/1/2022
|
2/1/2022
| A |
-Window frame fasteners for South, East and West elevations 2nd and 3rd levels
|
|
12114600-115
| P FRMG |
1/24/2022
|
1/24/2022
| A |
-Window sill tapcons for remaining windows on 2nd and 3rd levels (South, East and West elevations only).
|
|
12114600-119
| P INSU |
1/24/2022
|
1/26/2022
| A |
-partial pass roof insulation screw off under tpo roof North West corner
|
|
32106118-306
| P USLB |
1/21/2022
|
1/24/2022
| A |
-
|
|
12114600-131
| WINDOW |
1/21/2022
|
1/21/2022
| C |
-Partial pass. Window sill tapcons for "A" windows on 2nd and 3rd levels (South, East and West elevations only).
|
|
32106118-306
| P USLB |
1/20/2022
|
1/20/2022
| A |
-
|
|
12114600-115
| P FRMG |
12/28/2021
|
12/27/2021
| A |
-3RD LEVEL - ELEVATED SLAB REINFORCEMENT
|
|
12114600-111
| P FNDT |
12/28/2021
|
12/23/2021
| C |
-
|
|
12114600-111
| P FNDT |
11/10/2021
|
11/10/2021
| A |
-(4) F7.0 footings for canopy
|
|
32106118-301
| U/SLAB |
10/19/2021
|
10/19/2021
| A |
-
|
|
12114600-111
| P FNDT |
10/18/2021
|
10/18/2021
| A |
-remaining tilt panel rebar and embeds. (A1-A8, B1-B7, F1 and G1)
|
|
12114600-111
| P FNDT |
10/8/2021
|
10/10/2021
| A |
-Tilt panels rebar, panels D1 through D7 and E1. Embeds complete for 2 panels from last inspection.
|
|
12114600-111
| P FNDT |
10/7/2021
|
10/6/2021
| A |
-Tilt panel rebar and embed count for panels C2-C6 and C9. Rebar only in panels C7 and C8.
|
|
12114600-111
| P FNDT |
10/5/2021
|
10/5/2021
| A |
-elevator pit walls rebar.
|
|
12114600-111
| P FNDT |
10/1/2021
|
10/1/2021
| A |
-footing for elevator and adjacent footing at column line B-5.
|
|
12114600-111
| P FNDT |
9/30/2021
|
9/30/2021
| A |
-remaining wf5.0 footings around perimeter.
|
|
12114600-111
| P FNDT |
9/29/2021
|
9/29/2021
| A |
-Footing from E1-E10 and E10 - D.3-10.
|
|
12114600-111
| P FNDT |
9/21/2021
|
9/21/2021
| A |
-footings at C5, C6, C7 and C8.
|
|
12114600-111
| P FNDT |
9/16/2021
|
9/17/2021
| A |
-Footings at D5, C9 and WF5.0 footings from 1E to 3A on 9/16. WF5.0 footings from 3A to 10-A.5 on 9/17.
|
|
12114600-111
| P FNDT |
9/15/2021
|
9/16/2021
| A |
-footings at D6, D7, D8 and D9
|
|
12114600-111
| P FNDT |
9/15/2021
|
9/14/2021
| A |
-FOOTINGS B-D/3
|
|
12114600-101
| FND/FT |
9/14/2021
|
9/14/2021
| A |
-Footings at the following column lines B4, B6, B7, B8, B9, C4 and D4.
|