22401380-212
| ENERGZ |
10/20/2025
|
10/17/2025
| A |
-House meter
|
|
22401380-212
| ENERGZ |
10/10/2025
|
10/10/2025
| C |
-Not ready
|
|
22401380-212
| ENERGZ |
8/14/2025
|
8/14/2025
| C |
-Not ready
|
|
12317421-110
| FIRE W |
8/14/2025
|
8/14/2025
| A |
-
|
|
12317421-120
| P FIRE |
7/1/2025
|
7/1/2025
| A |
-
|
|
12317421-109
| INSULA |
6/26/2025
|
6/26/2025
| A |
-
|
|
12317421-131
| WINDOW |
6/26/2025
|
6/26/2025
| A |
-
|
|
12317421-107
| SHTHNG |
6/26/2025
|
6/26/2025
| A |
-ICF wall system
|
|
12317421-106
| RF D&T |
6/26/2025
|
6/26/2025
| A |
-
|
|
12317421-105
| FRAMNG |
6/26/2025
|
6/26/2025
| A |
-Pre engineered metal building
|
|
22401380-203
| RGH EL |
6/26/2025
|
6/26/2025
| A |
-
|
|
12317421-113
| P LNTL |
5/2/2025
|
5/5/2025
| A |
-
|
|
12317421-113
| P LNTL |
4/28/2025
|
4/30/2025
| A |
-
|
|
12317421-113
| P LNTL |
4/11/2025
|
4/14/2025
| A |
-Insulated wall sysytem 2nd FL
|
|
12317421-103
| LINTEL |
12/9/2024
|
12/10/2024
| A |
-Balance of wall sysytem for 1 story portion of bldg
|
|
12317421-104
| BEAMS. |
10/28/2024
|
10/29/2024
| A |
-Formed wall system balance of building perimeter.
|
|
12317421-114
| P CL&B |
10/8/2024
|
10/8/2024
| A |
-See inspection report on file. Insulated wall system reinforcing.
|
|
12317421-113
| P LNTL |
8/29/2024
|
9/4/2024
| A |
-Top out of elevator shaft.
|
|
12317421-113
| P LNTL |
8/15/2024
|
8/15/2024
| A |
-
|
|
12317421-112
| P SLAB |
6/17/2024
|
6/17/2024
| A |
-
|
|
12317421-111
| P FNDT |
6/4/2024
|
6/6/2024
| A |
-Elevator pit
|
|
12317421-111
| P FNDT |
5/22/2024
|
5/28/2024
| A |
-
|
|
12317421-102
| SLAB.. |
5/21/2024
|
5/21/2024
| A |
-Partial 1st floor wing only
|
|
12317421-101
| FND/FT |
5/1/2024
|
5/1/2024
| A |
-
|
|
12317421-101
| FND/FT |
4/18/2024
|
4/19/2024
| D |
-
|
|
32401193-301
| U/SLAB |
2/29/2024
|
3/1/2024
| A |
BARLEY, JOHN M II-
|