82204694-805
| IRRGTN |
12/27/2022
|
12/29/2022
| A |
-
|
|
42210963-408
| GASFNL |
12/27/2022
|
12/29/2022
| A |
-
|
|
42211081-403
| MC FNL |
12/27/2022
|
12/29/2022
| A |
-
|
|
32203079-304
| PL FNL |
12/27/2022
|
12/29/2022
| A |
NAZARIO, EDGAR R-
|
|
22210992-204
| EL FNL |
12/27/2022
|
12/29/2022
| A |
-
|
|
12203099-125
| BL FNL |
12/27/2022
|
12/29/2022
| A |
-
|
|
22210992-213
| MTR CN |
12/1/2022
|
12/1/2022
| A |
-12/1 mb - review lathing placement and fastening for stucco accents. All per plan and code. Also review requirements for meter can place early power. Meter complete and safe, panel all blocked except for 3 breakers, and those three circuit locations safe. SJC protocol to require electrician to s
|
|
12203099-108
| LTH NL |
12/1/2022
|
12/1/2022
| A |
-12/1 mb - review lathing placement and fastening for stucco accents. All per plan and code. Also review requirements for meter can place early power. Meter complete and safe, panel all blocked except for 3 breakers, and those three circuit locations safe. SJC protocol to require electrician to s
|
|
22210992-213
| MTR CN |
11/23/2022
|
11/23/2022
| D |
-Attempted to perform a meter can check per protocol:
This site is not ready for the following reasons:
1. no addressing posted
2. AC system is not trimmed out to include condenser disconnects.
3. Open blank space in breaker panel.
Results: not past
|
|
12203099-109
| INSULA |
10/24/2022
|
10/24/2022
| A |
-
|
|
42210963-407
| GS RGH |
10/17/2022
|
10/17/2022
| A |
-10/17 mb - review complete rough- mechanical HVAC, mechanical gas, electric, plumbing, framing and fire caulk. All per plan and code. Result Pass. Please add 131 dry in- zip sheathing taped, windows and doors flashed, fastened, and taped. Result Pass
|
|
42211081-401
| MC RGH |
10/17/2022
|
10/17/2022
| A |
-10/17 mb - review complete rough- mechanical HVAC, mechanical gas, electric, plumbing, framing and fire caulk. All per plan and code. Result Pass. Please add 131 dry in- zip sheathing taped, windows and doors flashed, fastened, and taped. Result Pass
|
|
32203079-303
| RGH PL |
10/17/2022
|
10/17/2022
| A |
NAZARIO, EDGAR R-10/17 mb - review complete rough- mechanical HVAC, mechanical gas, electric, plumbing, framing and fire caulk. All per plan and code. Result Pass. Please add 131 dry in- zip sheathing taped, windows and doors flashed, fastened, and taped. Result Pass
|
|
22210992-203
| RGH EL |
10/17/2022
|
10/17/2022
| A |
-10/17 mb - review complete rough- mechanical HVAC, mechanical gas, electric, plumbing, framing and fire caulk. All per plan and code. Result Pass. Please add 131 dry in- zip sheathing taped, windows and doors flashed, fastened, and taped. Result Pass
|
|
12203099-131
| WINDOW |
10/17/2022
|
10/17/2022
| A |
-10/17 mb - review complete rough- mechanical HVAC, mechanical gas, electric, plumbing, framing and fire caulk. All per plan and code. Result Pass. Please add 131 dry in- zip sheathing taped, windows and doors flashed, fastened, and taped. Result Pass
|
|
12203099-105
| FRAMNG |
10/17/2022
|
10/17/2022
| A |
-10/17 mb - review complete rough- mechanical HVAC, mechanical gas, electric, plumbing, framing and fire caulk. All per plan and code. Result Pass. Please add 131 dry in- zip sheathing taped, windows and doors flashed, fastened, and taped. Result Pass
|
|
12203099-100
| CM RGH |
10/17/2022
|
10/17/2022
| A |
-10/17 mb - review complete rough- mechanical HVAC, mechanical gas, electric, plumbing, framing and fire caulk. All per plan and code. Result Pass. Please add 131 dry in- zip sheathing taped, windows and doors flashed, fastened, and taped. Result Pass
|
|
12203099-106
| RF D&T |
8/10/2022
|
8/12/2022
| A |
-08/10 mb review all straps and ties and dry in. All per structural plans and code. Please result 206 pass. Also review dry in. Windows in and secure, doors are not in. Walls are dried in except for windows. Roof is dry in. Result dry in as Partial Pass so that shingling can commence.
|
|
12203099-106
| RF D&T |
7/27/2022
|
7/27/2022
| C |
-
|
|
12203099-107
| SHTHNG |
7/27/2022
|
7/27/2022
| A |
-07/27 mb - review roof and wall sheathing placement and nailing. Result 107 wall sheathing Pass; result 116 roof sheathing Pass. 110 rated wall was partial on 6/15 and should have been passed on 6/22. Note 106 roof deck and ties not ready today.
|
|
12203099-116
| RF SHT |
7/27/2022
|
7/27/2022
| A |
-07/27 mb - review roof and wall sheathing placement and nailing. Result 107 wall sheathing Pass; result 116 roof sheathing Pass. 110 rated wall was partial on 6/15 and should have been passed on 6/22. Note 106 roof deck and ties not ready today.
|
|
12203099-110
| FIRE W |
6/23/2022
|
6/22/2022
| A |
-06/22 mb review rated wall nail off for section above top plate. Result partial Pass
|
|
12203099-120
| P FIRE |
6/15/2022
|
6/15/2022
| A |
-06/15 mb - review below top plate rated wall between sides of duplex. Result partial pass…as additional stages of rated wall completion are necessary.
|
|
12203099-102
| SLAB.. |
5/19/2022
|
5/18/2022
| A |
-mb review prep for slab, all per plan and spec- result pass.
|
|
32203079-301
| U/SLAB |
5/13/2022
|
5/16/2022
| A |
NAZARIO, EDGAR R- review under slab plumbing. All in place, hot/cold is, ac chase below footing. Result Pass.
|