42202898-408
| GASFNL |
12/7/2022
|
12/8/2022
| A |
-12/7 mb - review for 123 bldg final. Walked site with Rob. All trades complete and operational, building complete except for minor cosmetic. Result all Pass.
|
|
42203837-403
| MC FNL |
12/7/2022
|
12/8/2022
| A |
-12/7 mb - review for 123 bldg final. Walked site with Rob. All trades complete and operational, building complete except for minor cosmetic. Result all Pass.
|
|
32107993-304
| PL FNL |
12/7/2022
|
12/8/2022
| A |
NAZARIO, EDGAR R-12/7 mb - review for 123 bldg final. Walked site with Rob. All trades complete and operational, building complete except for minor cosmetic. Result all Pass.
|
|
22205122-204
| EL FNL |
12/7/2022
|
12/8/2022
| A |
-12/7 mb - review for 123 bldg final. Walked site with Rob. All trades complete and operational, building complete except for minor cosmetic. Result all Pass.
|
|
12119251-125
| BL FNL |
12/7/2022
|
12/8/2022
| A |
-12/7 mb - review for 123 bldg final. Walked site with Rob. All trades complete and operational, building complete except for minor cosmetic. Result all Pass.
|
|
22205122-213
| MTR CN |
10/5/2022
|
10/6/2022
| A |
-Electrical meter can inspection- Pass - BC - Notes: meter can box inspected, breaker panel box inspected and only had a/c handler and condensing unit, laundry room, and pool brakers installed. All other sections of the house was not inspected.
|
|
12119251-109
| INSULA |
6/7/2022
|
6/7/2022
| A |
-06/07 mb- review insulation- result pass
|
|
42202898-407
| GS RGH |
5/19/2022
|
5/19/2022
| A |
-review house with Supt Rob White. Complete rough: rough mechanical, HVAC supply and return, bathroom fan venting, top out plumbing, supply and drain pressure, rough electric and low voltage placed and secured and terminated, gas piping and pressure, completed framing, dry in, windows and doors fas
|
|
42203837-401
| MC RGH |
5/19/2022
|
5/19/2022
| A |
-review house with Supt Rob White. Complete rough: rough mechanical, HVAC supply and return, bathroom fan venting, top out plumbing, supply and drain pressure, rough electric and low voltage placed and secured and terminated, gas piping and pressure, completed framing, dry in, windows and doors fas
|
|
32107993-303
| RGH PL |
5/19/2022
|
5/19/2022
| A |
NAZARIO, EDGAR R-
|
|
22205122-203
| RGH EL |
5/19/2022
|
5/19/2022
| A |
-review house with Supt Rob White. Complete rough: rough mechanical, HVAC supply and return, bathroom fan venting, top out plumbing, supply and drain pressure, rough electric and low voltage placed and secured and terminated, gas piping and pressure, completed framing, dry in, windows and doors fas
|
|
12119251-131
| WINDOW |
5/19/2022
|
5/19/2022
| A |
-review house with Supt Rob White. Complete rough: rough mechanical, HVAC supply and return, bathroom fan venting, top out plumbing, supply and drain pressure, rough electric and low voltage placed and secured and terminated, gas piping and pressure, completed framing, dry in, windows and doors fas
|
|
12119251-105
| FRAMNG |
5/19/2022
|
5/19/2022
| A |
-review house with Supt Rob White. Complete rough: rough mechanical, HVAC supply and return, bathroom fan venting, top out plumbing, supply and drain pressure, rough electric and low voltage placed and secured and terminated, gas piping and pressure, completed framing, dry in, windows and doors fas
|
|
12119251-100
| CM RGH |
5/19/2022
|
5/19/2022
| A |
-review house with Supt Rob White. Complete rough: rough mechanical, HVAC supply and return, bathroom fan venting, top out plumbing, supply and drain pressure, rough electric and low voltage placed and secured and terminated, gas piping and pressure, completed framing, dry in, windows and doors fas
|
|
12119251-106
| RF D&T |
5/6/2022
|
5/6/2022
| A |
-
|
|
12119251-102
| SLAB.. |
5/6/2022
|
5/5/2022
| C |
-
|
|
32107993-301
| U/SLAB |
3/11/2022
|
3/10/2022
| A |
NAZARIO, EDGAR R-
|
|
12119251-117
| P WLLS |
3/10/2022
|
3/10/2022
| A |
-
|
|
12119251-107
| SHTHNG |
3/10/2022
|
3/10/2022
| A |
-
|