Permit #AprvDescSchedDtInspDtResultRemarks
82201730-805 IRRGTN 6/17/2022 6/17/2022 A -
42200793-403 MC FNL 6/17/2022 6/17/2022 A -
32106118-304 PL FNL 6/17/2022 6/17/2022 A MARVEL, ROBERT E-
22109210-204 EL FNL 6/17/2022 6/17/2022 A -
12114600-125 BL FNL 6/17/2022 6/17/2022 A -
22109210-204 EL FNL 6/15/2022 6/15/2022 C -
42200793-403 MC FNL 6/15/2022 6/15/2022 C -
12114600-120 P FIRE 6/14/2022 6/14/2022 A -drywall fastening duct shaftwall 2nd and 3rd level.
42200793-405 P MECH 6/13/2022 6/13/2022 A -
22109210-210 P RGHN 6/13/2022 6/13/2022 A -
12114600-110 FIRE W 6/8/2022 6/7/2022 C -partial pass. 3rd level and 2nd level shaft wall screw off (dens)
22109210-210 P RGHN 6/2/2022 6/3/2022 A -
12114600-115 P FRMG 6/2/2022 6/1/2022 C -
22109210-210 P RGHN 6/2/2022 6/1/2022 C -
22109210-203 RGH EL 5/16/2022 5/16/2022 A -RTU hook up.
22109210-213 MTR CN 5/11/2022 5/13/2022 A -
32106118-302 TOPOUT 4/29/2022 4/29/2022 A MARVEL, ROBERT E-
12114600-120 P FIRE 4/27/2022 4/27/2022 A -drywall screw off for elevator entry walls and stairs adjacent to elevators.
12114600-120 P FIRE 4/22/2022 4/22/2022 A -shaftliner at elevator door walls all levels.
32106118-308 P RGH. 4/18/2022 4/19/2022 A MARVEL, ROBERT E-
12114600-115 P FRMG 4/5/2022 4/4/2022 A -entry canopy framing
22109210-210 P RGHN 3/31/2022 3/31/2022 A - Canopy and I.T. Rooms.
12114600-000 INFO.. 3/21/2022 3/18/2022 A -Rain leaders from floor to roof.
32106118-308 P RGH. 3/21/2022 3/18/2022 A MARVEL, ROBERT E-DWV from 1st floor to roof. She’ll permit. Includes bathrooms.
12114600-120 P FIRE 3/21/2022 3/21/2022 A -corridor drywall fastening all levels.
22109210-210 P RGHN 3/10/2022 3/11/2022 A -Partial corridors only walls all 3 floors
12114600-120 P FIRE 3/2/2022 3/2/2022 A -drywall screw off 1st floor corridors down approximately 6'from top of wall
42200793-401 MC RGH 2/25/2022 2/25/2022 A -Duct Seal MOB Building
12114600-120 P FIRE 2/23/2022 2/24/2022 A -shaft liner and 1st layer of drywall elevators 2nd and 3rd levels.
12114600-115 P FRMG 2/23/2022 2/24/2022 A -shaft framing 3 sides of elevator 2nd and 3rd levels.
12114600-115 P FRMG 2/16/2022 2/17/2022 A -remaining window pan fasteners 1st floor
12114600-102 SLAB.. 2/9/2022 2/9/2022 C -1/2 of slab on grade (West half of project). Only cancelled since it should have been partial slab inspection.
12114600-105 FRAMNG 2/2/2022 2/3/2022 C -Partial Pass - 2nd and 3rd levels interior shell framing ok.
12114600-131 WINDOW 2/2/2022 2/3/2022 C -Partial pass - North elevation window sill fasteners for smaller "A" windows only 2nd and 3rd levels
12114600-115 P FRMG 2/1/2022 2/1/2022 A -Window frame fasteners for South, East and West elevations 2nd and 3rd levels
12114600-115 P FRMG 1/24/2022 1/24/2022 A -Window sill tapcons for remaining windows on 2nd and 3rd levels (South, East and West elevations only).
12114600-119 P INSU 1/24/2022 1/26/2022 A -partial pass roof insulation screw off under tpo roof North West corner
32106118-306 P USLB 1/21/2022 1/24/2022 A MARVEL, ROBERT E-
12114600-131 WINDOW 1/21/2022 1/21/2022 C -Partial pass. Window sill tapcons for "A" windows on 2nd and 3rd levels (South, East and West elevations only).
32106118-306 P USLB 1/20/2022 1/20/2022 A MARVEL, ROBERT E-
12114600-115 P FRMG 12/28/2021 12/27/2021 A -3RD LEVEL - ELEVATED SLAB REINFORCEMENT
12114600-111 P FNDT 12/28/2021 12/23/2021 C -
12114600-111 P FNDT 11/10/2021 11/10/2021 A -(4) F7.0 footings for canopy
32106118-301 U/SLAB 10/19/2021 10/19/2021 A MARVEL, ROBERT E-
12114600-111 P FNDT 10/18/2021 10/18/2021 A -remaining tilt panel rebar and embeds. (A1-A8, B1-B7, F1 and G1)
12114600-111 P FNDT 10/8/2021 10/10/2021 A -Tilt panels rebar, panels D1 through D7 and E1. Embeds complete for 2 panels from last inspection.
12114600-111 P FNDT 10/7/2021 10/6/2021 A -Tilt panel rebar and embed count for panels C2-C6 and C9. Rebar only in panels C7 and C8.
12114600-111 P FNDT 10/5/2021 10/5/2021 A -elevator pit walls rebar.
12114600-111 P FNDT 10/1/2021 10/1/2021 A -footing for elevator and adjacent footing at column line B-5.
12114600-111 P FNDT 9/30/2021 9/30/2021 A -remaining wf5.0 footings around perimeter.
12114600-111 P FNDT 9/29/2021 9/29/2021 A -Footing from E1-E10 and E10 - D.3-10.
12114600-111 P FNDT 9/21/2021 9/21/2021 A -footings at C5, C6, C7 and C8.
12114600-111 P FNDT 9/16/2021 9/17/2021 A -Footings at D5, C9 and WF5.0 footings from 1E to 3A on 9/16. WF5.0 footings from 3A to 10-A.5 on 9/17.
12114600-111 P FNDT 9/15/2021 9/16/2021 A -footings at D6, D7, D8 and D9
12114600-111 P FNDT 9/15/2021 9/14/2021 A -FOOTINGS B-D/3
12114600-101 FND/FT 9/14/2021 9/14/2021 A -Footings at the following column lines B4, B6, B7, B8, B9, C4 and D4.