82204627-805
| IRRGTN |
2/21/2023
|
2/21/2023
| A |
-
|
|
42207942-403
| MC FNL |
2/21/2023
|
2/21/2023
| A |
-
|
|
32201823-304
| PL FNL |
2/21/2023
|
2/21/2023
| A |
-
|
|
22208474-204
| EL FNL |
2/21/2023
|
2/21/2023
| A |
NAZARIO, EDGAR R-
|
|
12200744-125
| BL FNL |
2/21/2023
|
2/21/2023
| A |
-
|
|
22208474-213
| MTR CN |
12/14/2022
|
12/13/2022
| A |
NAZARIO, EDGAR R-12/13 mb - result pass; meter location safe and complete, panels all blocked off except for AC units and laundry, and those circuit locations with disconnect/ covered receptacles.
|
|
22208474-213
| MTR CN |
12/8/2022
|
12/9/2022
| C |
-
|
|
12200744-109
| INSULA |
10/14/2022
|
10/17/2022
| A |
-
|
|
42207942-401
| MC RGH |
9/2/2022
|
9/8/2022
| A |
-09/08 mb- reviewed whole house for all framing, and all trades. Result 100 complete rough pass. Complete rough including rough HVAC, rough gas, rough electric, top out plumbing, and dry in.
|
|
32201823-303
| RGH PL |
9/2/2022
|
9/8/2022
| A |
-09/08 mb- reviewed whole house for all framing, and all trades. Result 100 complete rough pass. Complete rough including rough HVAC, rough gas, rough electric, top out plumbing, and dry in.
|
|
22208474-203
| RGH EL |
9/2/2022
|
9/8/2022
| A |
NAZARIO, EDGAR R-09/08 mb- reviewed whole house for all framing, and all trades. Result 100 complete rough pass. Complete rough including rough HVAC, rough gas, rough electric, top out plumbing, and dry in.
|
|
12200744-131
| WINDOW |
9/2/2022
|
9/8/2022
| A |
-09/08 mb- reviewed whole house for all framing, and all trades. Result 100 complete rough pass. Complete rough including rough HVAC, rough gas, rough electric, top out plumbing, and dry in.
|
|
12200744-105
| FRAMNG |
9/2/2022
|
9/8/2022
| A |
-09/08 mb- reviewed whole house for all framing, and all trades. Result 100 complete rough pass. Complete rough including rough HVAC, rough gas, rough electric, top out plumbing, and dry in.
|
|
12200744-100
| CM RGH |
9/2/2022
|
9/8/2022
| A |
-09/08 mb- reviewed whole house for all framing, and all trades. Result 100 complete rough pass. Complete rough including rough HVAC, rough gas, rough electric, top out plumbing, and dry in.
|
|
12200744-106
| RF D&T |
7/8/2022
|
7/19/2022
| A |
-
|
|
12200744-107
| SHTHNG |
5/4/2022
|
5/4/2022
| A |
-mb- review plans and walk site with Rob White. All wall and roof sheathing nailed per plan. Result 107 wall sheathing pass; 116 roof sheathing pass
|
|
12200744-116
| RF SHT |
5/4/2022
|
5/4/2022
| A |
-mb- review plans and walk site with Rob White. All wall and roof sheathing nailed per plan. Result 107 wall sheathing pass; 116 roof sheathing pass
|
|
12200744-112
| P SLAB |
4/13/2022
|
4/13/2022
| A |
-
|
|
12200744-102
| SLAB.. |
4/8/2022
|
4/13/2022
| A |
-review plans and walk site with Rob White. Plans for Borate for termite treatment. Mono slab and footing layout per plan and detail…all rebar and vapor barrier in place. Please result pass for slab.
|
|
32201823-301
| U/SLAB |
4/5/2022
|
4/5/2022
| A |
-
|