82300558-805
| IRRGTN |
4/12/2023
|
4/14/2023
| A |
-
|
|
42208171-408
| GASFNL |
4/12/2023
|
4/14/2023
| A |
-
|
|
42208325-403
| MC FNL |
4/12/2023
|
4/14/2023
| A |
-
|
|
32201817-304
| PL FNL |
4/12/2023
|
4/14/2023
| A |
-
|
|
22208473-204
| EL FNL |
4/12/2023
|
4/14/2023
| A |
NAZARIO, EDGAR R-
|
|
12200746-125
| BL FNL |
4/12/2023
|
4/14/2023
| A |
-
|
|
22208473-213
| MTR CN |
1/18/2023
|
1/18/2023
| A |
NAZARIO, EDGAR R-
|
|
12200746-108
| LTH NL |
11/15/2022
|
11/16/2022
| A |
-
|
|
12200746-109
| INSULA |
11/9/2022
|
11/10/2022
| A |
-
|
|
42208171-407
| GS RGH |
10/24/2022
|
10/24/2022
| A |
-
|
|
42208325-401
| MC RGH |
10/24/2022
|
10/24/2022
| A |
-
|
|
32201817-303
| RGH PL |
10/24/2022
|
10/24/2022
| A |
-
|
|
22208473-203
| RGH EL |
10/24/2022
|
10/24/2022
| A |
NAZARIO, EDGAR R-
|
|
12200746-131
| WINDOW |
10/24/2022
|
10/24/2022
| A |
-
|
|
12200746-105
| FRAMNG |
10/24/2022
|
10/24/2022
| A |
-
|
|
12200746-100
| CM RGH |
10/24/2022
|
10/24/2022
| A |
-
|
|
12200746-116
| RF SHT |
7/8/2022
|
7/19/2022
| A |
-
|
|
12200746-107
| SHTHNG |
7/8/2022
|
7/19/2022
| A |
-
|
|
12200746-117
| P WLLS |
5/10/2022
|
5/11/2022
| A |
-05/10- review plans and site with Rob White. Results: 116 roof sheathing pass; 107 wall sheathing: pass.
|
|
12200746-106
| RF D&T |
5/10/2022
|
5/11/2022
| A |
-05/10- review plans and site with Rob White. Results: 116 roof sheathing pass; 107 wall sheathing: pass.
|
|
12200746-102
| SLAB.. |
3/30/2022
|
3/29/2022
| A |
-Foundation for Monolithic slab per plan and spec, for slab, combined footings, pile caps, embedded straps with added rebar per Simpson instructions. 6 mil vapor barrier and termite bond set up.
|