|
12205061-125
| BL FNL |
1/18/2023
|
1/18/2023
| A |
-
|
|
82203552-805
| IRRGTN |
1/13/2023
|
1/13/2023
| A |
-
|
|
42207608-408
| GASFNL |
1/13/2023
|
1/13/2023
| A |
-
|
|
42210133-403
| MC FNL |
1/13/2023
|
1/13/2023
| A |
-
|
|
32202167-304
| PL FNL |
1/13/2023
|
1/13/2023
| A |
-
|
|
22206023-204
| EL FNL |
1/13/2023
|
1/13/2023
| A |
COLASANTI, JOSEPH-
|
|
12205061-125
| BL FNL |
1/13/2023
|
1/13/2023
| D |
-check note
|
|
22206023-213
| MTR CN |
10/26/2022
|
10/26/2022
| A |
COLASANTI, JOSEPH-
|
|
12205061-109
| INSULA |
10/19/2022
|
10/19/2022
| A |
-
|
|
22206023-213
| MTR CN |
10/18/2022
|
10/18/2022
| D |
COLASANTI, JOSEPH-exposed wire outlet connection to box
|
|
42210133-401
| MC RGH |
10/11/2022
|
10/11/2022
| A |
-
|
|
12205061-105
| FRAMNG |
10/11/2022
|
10/11/2022
| A |
-
|
|
12205061-100
| CM RGH |
10/11/2022
|
10/11/2022
| A |
-
|
|
42207608-407
| GS RGH |
9/13/2022
|
9/13/2022
| A |
-
|
|
42210133-401
| MC RGH |
9/13/2022
|
9/13/2022
| D |
-
|
|
32202167-303
| RGH PL |
9/13/2022
|
9/13/2022
| A |
-
|
|
22206023-203
| RGH EL |
9/13/2022
|
9/13/2022
| A |
COLASANTI, JOSEPH-
|
|
12205061-131
| WINDOW |
9/13/2022
|
9/13/2022
| A |
-
|
|
12205061-105
| FRAMNG |
9/13/2022
|
9/13/2022
| D |
-
|
|
12205061-100
| CM RGH |
9/13/2022
|
9/13/2022
| D |
-check notes, 106 item not complete need to see structural at SGD pocket
|
|
12205061-106
| RF D&T |
8/18/2022
|
8/18/2022
| A |
-note uncover pocket door framing to see structural details
|
|
12205061-106
| RF D&T |
7/11/2022
|
7/11/2022
| D |
-need plans
|
|
12205061-130
| P R TI |
6/7/2022
|
6/7/2022
| A |
-
|
|
12205061-116
| RF SHT |
6/7/2022
|
6/7/2022
| A |
-
|
|
12205061-107
| SHTHNG |
6/7/2022
|
6/7/2022
| A |
-
|
|
32202167-302
| TOPOUT |
6/3/2022
|
6/3/2022
| A |
-
|
|
12205061-102
| SLAB.. |
4/12/2022
|
4/12/2022
| A |
-
|
|
12205061-102
| SLAB.. |
4/8/2022
|
4/8/2022
| D |
-Check notes
|
|
32202167-301
| U/SLAB |
4/5/2022
|
4/5/2022
| A |
-
|