Permit #AprvDescSchedDtInspDtResultRemarks
42202898-408 GASFNL 12/7/2022 12/8/2022 A -12/7 mb - review for 123 bldg final. Walked site with Rob. All trades complete and operational, building complete except for minor cosmetic. Result all Pass.
42203837-403 MC FNL 12/7/2022 12/8/2022 A -12/7 mb - review for 123 bldg final. Walked site with Rob. All trades complete and operational, building complete except for minor cosmetic. Result all Pass.
32107993-304 PL FNL 12/7/2022 12/8/2022 A -12/7 mb - review for 123 bldg final. Walked site with Rob. All trades complete and operational, building complete except for minor cosmetic. Result all Pass.
22205122-204 EL FNL 12/7/2022 12/8/2022 A NAZARIO, EDGAR R-12/7 mb - review for 123 bldg final. Walked site with Rob. All trades complete and operational, building complete except for minor cosmetic. Result all Pass.
12119251-125 BL FNL 12/7/2022 12/8/2022 A -12/7 mb - review for 123 bldg final. Walked site with Rob. All trades complete and operational, building complete except for minor cosmetic. Result all Pass.
22205122-213 MTR CN 10/5/2022 10/6/2022 A NAZARIO, EDGAR R-Electrical meter can inspection- Pass - BC - Notes: meter can box inspected, breaker panel box inspected and only had a/c handler and condensing unit, laundry room, and pool brakers installed. All other sections of the house was not inspected.
12119251-109 INSULA 6/7/2022 6/7/2022 A -06/07 mb- review insulation- result pass
42202898-407 GS RGH 5/19/2022 5/19/2022 A -review house with Supt Rob White. Complete rough: rough mechanical, HVAC supply and return, bathroom fan venting, top out plumbing, supply and drain pressure, rough electric and low voltage placed and secured and terminated, gas piping and pressure, completed framing, dry in, windows and doors fas
42203837-401 MC RGH 5/19/2022 5/19/2022 A -review house with Supt Rob White. Complete rough: rough mechanical, HVAC supply and return, bathroom fan venting, top out plumbing, supply and drain pressure, rough electric and low voltage placed and secured and terminated, gas piping and pressure, completed framing, dry in, windows and doors fas
32107993-303 RGH PL 5/19/2022 5/19/2022 A -
22205122-203 RGH EL 5/19/2022 5/19/2022 A NAZARIO, EDGAR R-review house with Supt Rob White. Complete rough: rough mechanical, HVAC supply and return, bathroom fan venting, top out plumbing, supply and drain pressure, rough electric and low voltage placed and secured and terminated, gas piping and pressure, completed framing, dry in, windows and doors fas
12119251-131 WINDOW 5/19/2022 5/19/2022 A -review house with Supt Rob White. Complete rough: rough mechanical, HVAC supply and return, bathroom fan venting, top out plumbing, supply and drain pressure, rough electric and low voltage placed and secured and terminated, gas piping and pressure, completed framing, dry in, windows and doors fas
12119251-105 FRAMNG 5/19/2022 5/19/2022 A -review house with Supt Rob White. Complete rough: rough mechanical, HVAC supply and return, bathroom fan venting, top out plumbing, supply and drain pressure, rough electric and low voltage placed and secured and terminated, gas piping and pressure, completed framing, dry in, windows and doors fas
12119251-100 CM RGH 5/19/2022 5/19/2022 A -review house with Supt Rob White. Complete rough: rough mechanical, HVAC supply and return, bathroom fan venting, top out plumbing, supply and drain pressure, rough electric and low voltage placed and secured and terminated, gas piping and pressure, completed framing, dry in, windows and doors fas
12119251-106 RF D&T 5/6/2022 5/6/2022 A -
12119251-102 SLAB.. 5/6/2022 5/5/2022 C -
32107993-301 U/SLAB 3/11/2022 3/10/2022 A -
12119251-117 P WLLS 3/10/2022 3/10/2022 A -
12119251-107 SHTHNG 3/10/2022 3/10/2022 A -