Permit #AprvDescSchedDtInspDtResultRemarks
32203895-304 PL FNL 1/5/2023 1/5/2023 A -
22209395-204 EL FNL 1/5/2023 1/5/2023 A -
12209610-125 BL FNL 1/5/2023 1/5/2023 A COLASANTI, JOSEPH-
82203628-805 IRRGTN 12/27/2022 12/23/2022 A -
42212150-408 GASFNL 12/27/2022 12/23/2022 A -
42211924-403 MC FNL 12/27/2022 12/23/2022 A -
32203895-304 PL FNL 12/27/2022 12/23/2022 D -
22209395-204 EL FNL 12/27/2022 12/23/2022 D -
12209610-125 BL FNL 12/27/2022 12/23/2022 D COLASANTI, JOSEPH-check notes on counter
22209395-213 MTR CN 11/16/2022 11/16/2022 A -
22209395-213 MTR CN 11/14/2022 11/14/2022 D -remove main conductors from lugs
22209395-213 MTR CN 10/27/2022 10/31/2022 D -Remove hot conductors from lugs
22209395-213 MTR CN 10/21/2022 10/21/2022 D -still no disconnect
22209395-213 MTR CN 10/17/2022 10/17/2022 D -check notes
12209610-109 INSULA 9/21/2022 9/21/2022 A COLASANTI, JOSEPH-
22209395-203 RGH EL 9/21/2022 9/21/2022 A -
12209610-131 WINDOW 9/21/2022 9/21/2022 A COLASANTI, JOSEPH-
12209610-105 FRAMNG 9/21/2022 9/21/2022 A COLASANTI, JOSEPH-
12209610-100 CM RGH 9/21/2022 9/21/2022 A COLASANTI, JOSEPH-
42212150-407 GS RGH 9/16/2022 9/16/2022 A -
22209395-203 RGH EL 9/16/2022 9/16/2022 D -need returns check notes, need to strap wire
12209610-131 WINDOW 9/16/2022 9/16/2022 D COLASANTI, JOSEPH-
12209610-105 FRAMNG 9/16/2022 9/16/2022 D COLASANTI, JOSEPH-
12209610-100 CM RGH 9/16/2022 9/16/2022 D COLASANTI, JOSEPH-check notes
42212150-407 GS RGH 9/8/2022 9/8/2022 D -Not installed
42211924-401 MC RGH 9/8/2022 9/8/2022 A -
32203895-303 RGH PL 9/8/2022 9/8/2022 A -
22209395-203 RGH EL 9/8/2022 9/8/2022 D -1. Wiring moved to inside of walls for house wrap. 2. Outlets/switches need re-positioned @ furred out wall 1st flr. 3. Service conductors and bond not installed through exterior wall.
12209610-131 WINDOW 9/8/2022 9/8/2022 D LAMM, JEFFREY CLELAND-Not installed. Openings covered.
12209610-105 FRAMNG 9/8/2022 9/8/2022 D LAMM, JEFFREY CLELAND-1. HTS20 2nd floor not complete(scab added). 2.E9 & E11 both have top cord scabs added. Not correct per truss details.
12209610-100 CM RGH 9/8/2022 9/8/2022 D LAMM, JEFFREY CLELAND-See notes
12209610-107 SHTHNG 8/23/2022 8/23/2022 A COLASANTI, JOSEPH-
12209610-106 RF D&T 8/18/2022 8/18/2022 A COLASANTI, JOSEPH-check note will look at sheathing inspection when ready
12209610-107 SHTHNG 8/18/2022 8/18/2022 D COLASANTI, JOSEPH-sheathing not nailed, check upstairs marked on wall
32203895-302 TOPOUT 8/17/2022 8/17/2022 A -
12209610-130 P R TI 8/16/2022 8/16/2022 A COLASANTI, JOSEPH-
12209610-116 RF SHT 8/16/2022 8/16/2022 A COLASANTI, JOSEPH-
12209610-107 SHTHNG 8/16/2022 8/16/2022 D COLASANTI, JOSEPH-check notes
12209610-102 SLAB.. 6/30/2022 6/30/2022 A COLASANTI, JOSEPH-
32203895-301 U/SLAB 6/28/2022 6/28/2022 A -