82204642-805
| IRRGTN |
2/7/2023
|
2/8/2023
| A |
-
|
|
42206185-408
| GASFNL |
2/7/2023
|
2/8/2023
| A |
-
|
|
42207009-403
| MC FNL |
2/7/2023
|
2/8/2023
| A |
-
|
|
32200178-304
| PL FNL |
2/7/2023
|
2/8/2023
| A |
-
|
|
22208470-204
| EL FNL |
2/7/2023
|
2/8/2023
| A |
-
|
|
12118773-125
| BL FNL |
2/7/2023
|
2/8/2023
| A |
NAZARIO, EDGAR R-
|
|
22208470-213
| MTR CN |
12/14/2022
|
12/13/2022
| A |
-12/13 mb - result pass; meter location safe and complete, panels all blocked off except for AC units and laundry, and those circuit locations with disconnect/ covered receptacles.
|
|
22208470-213
| MTR CN |
12/8/2022
|
12/9/2022
| C |
-
|
|
12118773-109
| INSULA |
10/14/2022
|
10/17/2022
| A |
NAZARIO, EDGAR R-
|
|
12118773-108
| LTH NL |
10/5/2022
|
10/6/2022
| A |
NAZARIO, EDGAR R-
|
|
42206185-407
| GS RGH |
9/2/2022
|
9/8/2022
| A |
-09/08 mb- reviewed whole house for all framing, tie downs, and all trades. Result 106 roof-deck/ties pass, and 100 complete rough pass. Complete rough including rough HVAC, rough gas, rough electric, top out plumbing, and dry in.
|
|
42207009-401
| MC RGH |
9/2/2022
|
9/8/2022
| A |
-09/08 mb- reviewed whole house for all framing, tie downs, and all trades. Result 106 roof-deck/ties pass, and 100 complete rough pass. Complete rough including rough HVAC, rough gas, rough electric, top out plumbing, and dry in.
|
|
32200178-303
| RGH PL |
9/2/2022
|
9/8/2022
| A |
-09/08 mb- reviewed whole house for all framing, tie downs, and all trades. Result 106 roof-deck/ties pass, and 100 complete rough pass. Complete rough including rough HVAC, rough gas, rough electric, top out plumbing, and dry in.
|
|
22208470-203
| RGH EL |
9/2/2022
|
9/8/2022
| A |
-09/08 mb- reviewed whole house for all framing, tie downs, and all trades. Result 106 roof-deck/ties pass, and 100 complete rough pass. Complete rough including rough HVAC, rough gas, rough electric, top out plumbing, and dry in.
|
|
12118773-131
| WINDOW |
9/2/2022
|
9/8/2022
| A |
NAZARIO, EDGAR R-09/08 mb- reviewed whole house for all framing, tie downs, and all trades. Result 106 roof-deck/ties pass, and 100 complete rough pass. Complete rough including rough HVAC, rough gas, rough electric, top out plumbing, and dry in.
|
|
12118773-105
| FRAMNG |
9/2/2022
|
9/8/2022
| A |
NAZARIO, EDGAR R-09/08 mb- reviewed whole house for all framing, tie downs, and all trades. Result 106 roof-deck/ties pass, and 100 complete rough pass. Complete rough including rough HVAC, rough gas, rough electric, top out plumbing, and dry in.
|
|
12118773-100
| CM RGH |
9/2/2022
|
9/8/2022
| A |
NAZARIO, EDGAR R-09/08 mb- reviewed whole house for all framing, tie downs, and all trades. Result 106 roof-deck/ties pass, and 100 complete rough pass. Complete rough including rough HVAC, rough gas, rough electric, top out plumbing, and dry in.
|
|
12118773-117
| P WLLS |
5/10/2022
|
5/12/2022
| A |
NAZARIO, EDGAR R-review plans and site with Rob White. Results: 116 roof sheathing pass; 107 wall sheathing: pass. Note these are the first inspections at this address…under slab plumbing and slab inspections by SJC.
|
|
12118773-116
| RF SHT |
5/10/2022
|
5/12/2022
| A |
NAZARIO, EDGAR R-review plans and site with Rob White. Results: 116 roof sheathing pass; 107 wall sheathing: pass. Note these are the first inspections at this address…under slab plumbing and slab inspections by SJC.
|
|
12118773-107
| SHTHNG |
5/3/2022
|
5/4/2022
| A |
HOWARD, MICHAEL N.- mb - review plans and walk site with Rob White. All wall and roof sheathing properly nailed. All ties and straps per engineering. Result: 107 wall sheathing pass; 116 roof sheathing pass, 106 roof desk and ties pass.
|
|
12118773-106
| RF D&T |
5/3/2022
|
5/4/2022
| A |
HOWARD, MICHAEL N.- mb - review plans and walk site with Rob White. All wall and roof sheathing properly nailed. All ties and straps per engineering. Result: 107 wall sheathing pass; 116 roof sheathing pass, 106 roof desk and ties pass.
|