| WORK INCOMPLETE |
| CONTACT INSPECTOR OR OFFICE |
| REVIEW INSPECTOR'S NOTES ON APPROVED JOB COPY PLANS |
| CONTROL JOINTS - MISSING / TYPE / AREAS / APPLICATION / LOCATION / SIZE |
| METER CAN - REQUIRES AIR SPACE PER NEC / MEMBRANE |
| SYSTEM - TYPE / MATERIAL / APPLICATION / INSTALLATION / THICKNESS / ACCESSORIES |