IMPACT FEE DUE
| 94-014523 1,347.00 |
10/20/1994 12:00:00 AM
| TM |
|
SEPTIC TANK FINAL
| |
4/5/1995 12:00:00 AM
| YRM |
|
HOLD POWER FOR LOT GRADING
| |
4/5/1995 12:00:00 AM
| YRM |
|
HOLD C/O ENGINEERING
| |
4/14/1995 12:00:00 AM
| YRM |
|
FIRST FLOOR ELEVATION
| |
12/27/1994 12:00:00 AM
| TC |
|
25 REINSP 1/17/95-ROUGH
| |
4/4/1995 12:00:00 AM
| RN |
|
REC D SIGNED EP LETTER
| |
4/3/1995 12:00:00 AM
| YRM |
|
HOLD C/O FOR ORIGINAL ELEVATION
| |
2/3/1995 12:00:00 AM
| TC |
|
25 REINSPEC FEE-04/12/95-FINAL
| |
4/14/1995 12:00:00 AM
| RN |
|
REC D UNSIGNED EP LETER
| |
3/28/1995 12:00:00 AM
| YRM |