|
7th Edition FBC (2020)
| |
| |
|
EARLY POWER LETTER REC'D
| |
3/1/2023 9:17:21 AM
| ccontestabile |
|
ENGINEER ELEVATION CERTIFICATION
| |
9/8/2022 3:26:39 PM
| mthomas |
|
HOLD C/O FOR SITE ASBUILT APPROV
| |
1/27/2023 12:46:57 PM
| smorrison |
|
IMPACT FEE DUE
| 22-060307 |
9/13/2022 2:18:49 PM
| mthom |
|
INFO NOC-
| 5579;1741 |
6/16/2022 10:20:05 AM
| bbonfanti |
|
LANDSCAPE INSPECTION REQ
| |
3/20/2023 3:41:48 PM
| |
|
LOT GRADING INSP REQ PRIOR C/O
| |
3/20/2023 3:05:50 PM
| |
|
METER CAN INSPECTION
| |
3/1/2023 12:57:24 PM
| air |
|
PAID UTILITY RECEIPT REQUIRED
| JEA |
3/7/2023 10:47:30 AM
| bshugart |
|
SOLID WASTE FEE DUE
| 22-039598 |
6/13/2022 12:06:51 PM
| ecann |
|
TERMITE BOND CO
| TURNER;WOOD |
6/7/2022 7:42:56 AM
| kcooper |
|
TERMITE PROTECTION CERT OF COMPL
| |
1/4/2023 11:09:20 AM
| slkling |