|
7th Edition FBC (2020)
| |
| |
|
EARLY POWER LETTER REC'D
| |
2/28/2023 4:22:19 PM
| bshugart |
|
ENGINEER ELEVATION CERTIFICATION
| |
7/7/2022 11:23:11 AM
| dwintons |
|
HOLD C/O FOR SUBDIVISION ASBUILT APPROVAL
| |
12/8/2022 9:48:23 AM
| BOCC |
|
IMPACT FEE DUE
| 23-004694 |
1/27/2023 8:41:21 AM
| nbrad |
|
INFO NOC-
| BK 5552 PG 829 |
5/31/2022 2:18:05 PM
| slkling |
|
LANDSCAPE INSPECTION REQ
| |
3/20/2023 10:13:37 AM
| |
|
LOT GRADING INSP REQ PRIOR C/O
| |
3/20/2023 3:06:28 PM
| |
|
METER CAN INSPECTION
| |
2/23/2023 12:52:45 PM
| air |
|
PAID UTILITY RECEIPT REQUIRED
| JEA |
11/17/2022 2:54:13 PM
| slkling |
|
SOLID WASTE FEE DUE
| 22-036547 |
6/1/2022 11:00:46 AM
| ecann |
|
TERMITE BOND CO
| B&B;WOOD |
5/26/2022 2:22:25 PM
| kcooper |
|
TERMITE PROTECTION CERT OF COMPL
| |
3/21/2023 3:24:55 PM
| ccontestabile |