|
7th Edition FBC (2020)
| |
| |
|
EARLY POWER LETTER REC'D
| |
9/14/2022 11:43:57 AM
| cgalloway |
|
ENGINEER ELEVATION CERTIFICATION
| |
6/20/2022 8:09:10 AM
| thowe |
|
HOLD C/O FOR SUBDIVISION ASBUILT APPROVAL
| |
6/10/2022 2:46:31 PM
| BOCC |
|
IMPACT FEE DUE
| 22-060896 |
9/15/2022 1:14:25 PM
| nbrad |
|
INFO NOC-
| 5571;419 |
6/6/2022 9:59:30 AM
| bbonfanti |
|
LANDSCAPE INSPECTION REQ
| |
3/10/2023 10:26:20 AM
| |
|
LOT GRADING INSP REQ PRIOR C/O
| |
3/28/2023 9:59:32 AM
| |
|
METER CAN INSPECTION
| |
9/15/2022 10:51:25 AM
| air |
|
PAID UTILITY RECEIPT REQUIRED
| SJCUD |
6/9/2022 8:33:26 AM
| bbonfanti |
|
SOLID WASTE FEE DUE
| 22-038068 |
6/7/2022 11:03:19 AM
| ecann |
|
TERMITE BOND CO
| TURNER;WOOD |
5/26/2022 1:19:33 PM
| kcooper |
|
TERMITE PROTECTION CERT OF COMPL
| |
3/9/2023 3:12:43 PM
| ccontestabile |