|
7th Edition FBC (2020)
| |
| |
|
EARLY POWER LETTER REC'D
| |
9/7/2022 9:10:44 AM
| slkling |
|
ENGINEER ELEVATION CERTIFICATION
| |
7/11/2022 4:27:49 PM
| dwintons |
|
HOLD C/O FOR SUBDIVISION ASBUILT APPROVAL
| |
9/22/2022 10:16:18 AM
| BOCC |
|
IMPACT FEE DUE
| 22-061888 |
9/20/2022 4:06:47 PM
| nbrad |
|
INFO NOC-
| BK 5547 PG 874 |
5/24/2022 9:57:48 AM
| slkling |
|
LANDSCAPE INSPECTION REQ
| |
4/25/2023 2:42:27 PM
| |
|
LOT GRADING INSP REQ PRIOR C/O
| |
4/25/2023 11:22:52 AM
| |
|
METER CAN INSPECTION
| |
9/7/2022 9:22:52 AM
| air |
|
PAID UTILITY RECEIPT REQUIRED
| JEA |
9/21/2022 2:03:16 PM
| slkling |
|
SOLID WASTE FEE DUE
| 22-034966 |
5/24/2022 11:26:58 AM
| ecann |
|
TERMITE BOND CO
| TURNER;WOOD |
5/20/2022 3:41:20 PM
| kcooper |
|
TERMITE PROTECTION CERT OF COMPL
| |
4/28/2023 3:02:32 PM
| bshugart |