|
7th Edition FBC (2020)
| |
| |
|
BAY WIND/FPLACE/EAVES/MAX 3 FT. PROJECTION
| |
| |
|
EARLY POWER LETTER REC'D
| |
2/2/2023 11:45:33 AM
| ecannon |
|
FEMA FORM REQUIRED
| FZ - AE BFE - 7' FFE - 10' GAR - 8.2' |
7/26/2022 10:24:11 AM
| wwoodward |
|
HOLD C/O FOR SUBDIVISION ASBUILT APPROVAL
| |
1/20/2022 2:27:48 PM
| amcbroom |
|
HOLD C/O: ORIGINAL FINISHED CONST FEMA
| FZ - AE BFE - 7' MER- 8' FFE - 10' GAR - 8.3' EQUIP- 8.3' |
3/29/2023 3:05:17 PM
| sperez |
|
IMPACT FEE DUE
| 23-004446 |
1/26/2023 8:45:53 AM
| nbrad |
|
INFO NOC-
| BK:5556 PG:937 |
5/19/2022 2:02:18 PM
| bmsmith |
|
LANDSCAPE INSPECTION REQ
| |
3/30/2023 9:42:53 AM
| |
|
LOT GRADING INSP REQ PRIOR C/O
| |
3/27/2023 7:55:20 AM
| |
|
METER CAN INSPECTION
| |
1/18/2023 2:36:58 PM
| air |
|
PAID UTILITY RECEIPT REQUIRED
| SJCUD |
3/30/2023 11:01:14 AM
| ecannon |
|
SOLID WASTE FEE DUE
| 23-004446 |
1/26/2023 8:45:53 AM
| nbrad |
|
TERMITE BOND CO
| FLORIDA PEST / SOIL |
5/19/2022 12:07:18 PM
| krobshaw |
|
TERMITE PROTECTION CERT OF COMPL
| |
3/28/2023 12:24:06 PM
| ecannon |
|
HOLD FINAL FOR SEPARATE METAL ROOF PERMIT
| 12214276 |
9/2/2022 8:18:03 AM
| kcooper |
|
HOLD 109 FOR SPRAY FOAM INSULATION REPORT
| |
12/7/2022 10:23:25 AM
| jdacosta |