|
7th Edition FBC (2020)
| |
| |
|
EARLY POWER LETTER REC'D
| |
12/6/2022 10:23:12 AM
| slkling |
|
ENGINEER ELEVATION CERTIFICATION
| |
7/1/2022 2:35:47 PM
| thowe |
|
HOLD C/O FOR SUBDIVISION ASBUILT APPROVAL
| |
12/8/2022 9:48:17 AM
| BOCC |
|
IMPACT FEE DUE
| 22-076093 |
12/9/2022 7:34:40 AM
| nbrad |
|
INFO NOC-
| BK 5552 PG 826 |
5/16/2022 4:11:38 PM
| slkling |
|
LANDSCAPE INSPECTION REQ
| |
1/6/2023 1:07:57 PM
| |
|
LOT GRADING INSP REQ PRIOR C/O
| |
1/19/2023 2:46:41 PM
| |
|
METER CAN INSPECTION
| |
12/5/2022 8:44:39 AM
| air |
|
PAID UTILITY RECEIPT REQUIRED
| JEA |
11/17/2022 3:14:56 PM
| slkling |
|
SOLID WASTE FEE DUE
| 22-032958 |
5/16/2022 11:55:35 AM
| bmsmi |
|
TERMITE BOND CO
| B&B;WOOD |
5/13/2022 1:44:16 PM
| kcooper |
|
TERMITE PROTECTION CERT OF COMPL
| |
12/12/2022 10:25:30 AM
| slkling |