|
7th Edition FBC (2020)
| |
| |
|
EARLY POWER LETTER REC'D
| |
9/22/2022 11:23:28 AM
| slkling |
|
ENGINEER ELEVATION CERTIFICATION
| |
7/11/2022 3:42:56 PM
| dwintons |
|
HOLD C/O FOR SUBDIVISION ASBUILT APPROVAL
| |
4/21/2022 8:42:34 AM
| ttrezza |
|
IMPACT FEE DUE
| 22-049450 |
7/26/2022 8:59:28 AM
| dwint |
|
INFO NOC-
| 5579;1748 |
6/16/2022 10:05:10 AM
| bbonfanti |
|
LANDSCAPE INSPECTION REQ
| |
1/5/2023 9:39:01 AM
| |
|
LOT GRADING INSP REQ PRIOR C/O
| |
1/5/2023 8:31:22 AM
| |
|
METER CAN INSPECTION
| |
9/22/2022 2:33:02 PM
| air |
|
PAID UTILITY RECEIPT REQUIRED
| SJCUD |
9/16/2022 1:47:03 PM
| slkling |
|
SOLID WASTE FEE DUE
| 22-039577 |
6/13/2022 11:45:42 AM
| ecann |
|
TERMITE BOND CO
| BRANDON;WOOD |
5/9/2022 12:18:08 PM
| kcooper |
|
TERMITE PROTECTION CERT OF COMPL
| |
8/5/2022 2:55:18 PM
| slkling |