|
7th Edition FBC (2020)
| |
| |
|
EARLY POWER LETTER REC'D
| |
8/15/2022 2:50:17 PM
| slkling |
|
ENGINEER ELEVATION CERTIFICATION
| |
7/5/2022 2:20:47 PM
| dwintons |
|
HOLD C/O FOR SUBDIVISION ASBUILT APPROVAL
| |
4/7/2022 7:51:29 AM
| amcbroom |
|
IMPACT FEE DUE
| 22-042030 |
6/22/2022 1:07:31 PM
| dwint |
|
INFO NOC-
| 5562;1265 |
6/2/2022 10:19:44 AM
| bbonfanti |
|
LANDSCAPE INSPECTION REQ
| |
12/8/2022 9:31:13 AM
| |
|
LOT GRADING INSP REQ PRIOR C/O
| |
12/8/2022 9:34:24 AM
| |
|
METER CAN INSPECTION
| |
8/16/2022 1:22:56 PM
| air |
|
PAID UTILITY RECEIPT REQUIRED
| SJCUD |
9/13/2022 3:42:53 PM
| slkling |
|
SOLID WASTE FEE DUE
| 22-031743 |
5/11/2022 9:34:24 AM
| cgall |
|
TERMITE BOND CO
| BRANDON;WOOD |
5/2/2022 2:05:04 PM
| kcooper |
|
TERMITE PROTECTION CERT OF COMPL
| |
7/18/2022 9:25:01 AM
| slkling |