|
7th Edition FBC (2020)
| |
| |
|
EARLY POWER LETTER REC'D
| |
12/27/2022 4:26:20 PM
| bshugart |
|
ENGINEER ELEVATION CERTIFICATION
| |
8/15/2022 4:09:50 PM
| mthomas |
|
HOLD C/O FOR SUBDIVISION ASBUILT APPROVAL
| |
4/11/2022 8:26:22 AM
| amcbroom |
|
IMPACT FEE DUE
| 22-049443 |
7/26/2022 8:52:16 AM
| dwint |
|
INFO NOC-
| 5589;258 |
6/30/2022 1:51:15 PM
| bbonfanti |
|
LANDSCAPE INSPECTION REQ
| |
1/17/2023 12:54:19 PM
| |
|
LOT GRADING INSP REQ PRIOR C/O
| |
1/17/2023 1:42:38 PM
| |
|
METER CAN INSPECTION
| |
12/28/2022 11:56:51 AM
| air |
|
PAID UTILITY RECEIPT REQUIRED
| SJCUD |
9/13/2022 4:17:14 PM
| slkling |
|
SOLID WASTE FEE DUE
| 22-039583 |
6/13/2022 11:49:09 AM
| ecann |
|
TERMITE BOND CO
| BRANDON;WOOD |
4/29/2022 10:40:15 AM
| kcooper |
|
TERMITE PROTECTION CERT OF COMPL
| |
8/18/2022 12:56:55 PM
| slkling |