|
7th Edition FBC (2020)
| |
| |
|
EARLY POWER LETTER REC'D
| |
10/5/2022 11:05:52 AM
| slkling |
|
ENGINEER ELEVATION CERTIFICATION
| |
8/1/2022 8:05:17 AM
| thowe |
|
HOLD C/O FOR SUBDIVISION ASBUILT APPROVAL
| |
4/11/2022 8:28:27 AM
| amcbroom |
|
IMPACT FEE DUE
| 22-060262 |
9/13/2022 1:14:41 PM
| mthom |
|
INFO NOC-
| BK:5602 PG:640 |
7/22/2022 2:41:14 PM
| bmsmith |
|
LANDSCAPE INSPECTION REQ
| |
1/27/2023 10:04:33 AM
| |
|
LOT GRADING INSP REQ PRIOR C/O
| |
1/26/2023 11:22:10 AM
| |
|
METER CAN INSPECTION
| |
10/4/2022 10:21:48 AM
| air |
|
PAID UTILITY RECEIPT REQUIRED
| SJCUD |
9/14/2022 9:47:36 AM
| slkling |
|
SOLID WASTE FEE DUE
| 22-046673 |
7/13/2022 11:38:07 AM
| ecann |
|
TERMITE BOND CO
| BRANDON;WOOD |
4/29/2022 8:03:30 AM
| kcooper |
|
TERMITE PROTECTION CERT OF COMPL
| TURNER;WOOD |
11/1/2022 10:36:20 AM
| bmsmith |