|
7th Edition FBC (2020)
| |
| |
|
EARLY POWER LETTER REC'D
| |
12/2/2022 10:28:03 AM
| slkling |
|
ENGINEER ELEVATION CERTIFICATION
| |
7/5/2022 2:36:30 PM
| dwintons |
|
HOLD C/O FOR SUBDIVISION ASBUILT APPROVAL
| |
4/7/2022 7:43:34 AM
| amcbroom |
|
IMPACT FEE DUE
| 22-042025 |
6/22/2022 1:01:06 PM
| dwint |
|
INFO NOC-
| 5558//1486 |
5/23/2022 8:20:47 AM
| alosco |
|
LANDSCAPE INSPECTION REQ
| |
1/5/2023 9:39:14 AM
| |
|
LOT GRADING INSP REQ PRIOR C/O
| |
1/5/2023 8:31:35 AM
| |
|
METER CAN INSPECTION
| |
8/18/2022 10:28:50 AM
| air |
|
PAID UTILITY RECEIPT REQUIRED
| SJCUD |
7/29/2022 2:05:51 PM
| kturner |
|
SOLID WASTE FEE DUE
| 22-031753 |
5/11/2022 9:38:26 AM
| cgall |
|
TERMITE BOND CO
| BRANDON;WOOD |
4/26/2022 12:48:25 PM
| kcooper |
|
TERMITE PROTECTION CERT OF COMPL
| |
7/15/2022 12:41:02 PM
| slkling |