|
7th Edition FBC (2020)
| |
| |
|
EARLY POWER LETTER REC'D
| |
10/6/2022 9:41:47 AM
| slkling |
|
ENGINEER ELEVATION CERTIFICATION
| |
8/11/2022 10:37:46 AM
| mthomas |
|
HOLD C/O FOR SUBDIVISION ASBUILT APPROVAL
| |
6/1/2022 12:28:34 PM
| BOCC |
|
IMPACT FEE DUE
| 22-076179 |
12/9/2022 11:09:12 AM
| nbrad |
|
INFO NOC-
| BK 5612 PG 1535 |
8/9/2022 9:56:12 AM
| slkling |
|
LANDSCAPE INSPECTION REQ
| |
1/6/2023 11:39:07 AM
| |
|
LOT GRADING INSP REQ PRIOR C/O
| |
1/5/2023 2:17:39 PM
| |
|
METER CAN INSPECTION
| |
10/5/2022 1:33:14 PM
| air |
|
PAID UTILITY RECEIPT REQUIRED
| JEA |
11/21/2022 2:17:19 PM
| clschmermund |
|
SOLID WASTE FEE DUE
| 22-027242 |
4/22/2022 2:48:50 PM
| kcoop |
|
TERMITE BOND CO
| TURNER;BAIT |
4/22/2022 2:48:33 PM
| kcooper |
|
TERMITE PROTECTION CERT OF COMPL
| |
1/18/2023 10:36:45 AM
| bshugart |