|
7th Edition FBC (2020)
| |
| |
|
EARLY POWER LETTER REC'D
| |
9/16/2022 10:43:03 AM
| slkling |
|
ENGINEER ELEVATION CERTIFICATION
| |
7/7/2022 11:04:52 AM
| dwintons |
|
HOLD C/O FOR SUBDIVISION ASBUILT APPROVAL
| |
4/4/2022 11:22:12 AM
| amcbroom |
|
IMPACT FEE DUE
| 22-061891 |
9/20/2022 4:08:11 PM
| nbrad |
|
INFO NOC-
| 5509//1485 |
4/21/2022 2:20:26 PM
| kcooper |
|
LANDSCAPE INSPECTION REQ
| |
3/20/2023 9:25:46 AM
| |
|
LOT GRADING INSP REQ PRIOR C/O
| |
3/20/2023 11:59:32 AM
| |
|
METER CAN INSPECTION
| |
9/19/2022 9:57:51 AM
| air |
|
PAID UTILITY RECEIPT REQUIRED
| JEA |
1/25/2023 3:56:31 PM
| ccontestabile |
|
SOLID WASTE FEE DUE
| 22-026841 |
4/21/2022 2:21:32 PM
| kcoop |
|
TERMITE BOND CO
| TURNER;WOOD |
4/21/2022 2:20:37 PM
| kcooper |
|
TERMITE PROTECTION CERT OF COMPL
| |
3/9/2023 3:13:31 PM
| ccontestabile |