|
7th Edition FBC (2020)
| |
| |
|
EARLY POWER LETTER REC'D
| |
8/9/2022 9:47:57 AM
| slkling |
|
ENGINEER ELEVATION CERTIFICATION
| |
6/21/2022 2:54:07 PM
| dwintons |
|
HOLD C/O FOR SUBDIVISION ASBUILT APPROVAL
| |
9/22/2022 10:29:23 AM
| BOCC |
|
IMPACT FEE DUE
| 22-039669 |
6/13/2022 2:31:20 PM
| dwint |
|
INFO NOC-
| 5544;1460 |
6/6/2022 9:57:45 AM
| bbonfanti |
|
LANDSCAPE INSPECTION REQ
| |
3/10/2023 10:59:31 AM
| |
|
LOT GRADING INSP REQ PRIOR C/O
| |
1/18/2023 2:26:42 PM
| |
|
METER CAN INSPECTION
| |
8/8/2022 1:06:10 PM
| air |
|
PAID UTILITY RECEIPT REQUIRED
| SJCUD |
9/13/2022 1:51:22 PM
| slkling |
|
SOLID WASTE FEE DUE
| 22-026824 |
4/21/2022 1:44:34 PM
| kcoop |
|
TERMITE BOND CO
| TURNER;WOOD |
4/21/2022 1:44:14 PM
| kcooper |
|
TERMITE PROTECTION CERT OF COMPL
| |
3/27/2023 3:42:27 PM
| bshugart |