|
7th Edition FBC (2020)
| |
| |
|
EARLY POWER LETTER REC'D
| |
9/2/2022 9:59:10 AM
| slkling |
|
ENGINEER ELEVATION CERTIFICATION
| |
7/20/2022 2:35:24 PM
| dwintons |
|
HOLD C/O FOR SUBDIVISION ASBUILT APPROVAL
| |
4/6/2022 12:52:41 PM
| amcbroom |
|
IMPACT FEE DUE
| 22-049462 |
7/26/2022 9:16:35 AM
| dwint |
|
INFO NOC-
| 5572;1585 |
6/6/2022 11:05:55 AM
| bbonfanti |
|
LANDSCAPE INSPECTION REQ
| |
1/18/2023 2:25:05 PM
| |
|
LOT GRADING INSP REQ PRIOR C/O
| |
1/25/2023 11:16:02 AM
| |
|
METER CAN INSPECTION
| |
9/2/2022 11:09:29 AM
| air |
|
PAID UTILITY RECEIPT REQUIRED
| SJCUD |
9/16/2022 1:48:36 PM
| slkling |
|
REINSPECTION FEE
| 23-003036 |
1/19/2023 9:29:03 AM
| ccont |
|
SOLID WASTE FEE DUE
| 22-031741 |
5/11/2022 9:34:06 AM
| cgall |
|
TERMITE BOND CO
| BRANDON;WOOD |
4/21/2022 10:55:04 AM
| kcooper |
|
TERMITE PROTECTION CERT OF COMPL
| |
8/5/2022 2:51:52 PM
| slkling |