|
7th Edition FBC (2020)
| |
| |
|
EARLY POWER LETTER REC'D
| |
11/22/2022 1:29:30 PM
| slkling |
|
ENGINEER ELEVATION CERTIFICATION
| |
7/11/2022 4:24:02 PM
| dwintons |
|
HOLD C/O FOR SUBDIVISION ASBUILT APPROVAL
| |
6/10/2022 2:46:31 PM
| BOCC |
|
IMPACT FEE DUE
| 22-053557 |
8/12/2022 1:08:37 PM
| mthom |
|
INFO NOC-
| 5574//475 |
6/14/2022 9:22:19 AM
| kcooper |
|
LANDSCAPE INSPECTION REQ
| |
1/11/2023 3:37:04 PM
| |
|
LOT GRADING INSP REQ PRIOR C/O
| |
1/10/2023 1:59:05 PM
| |
|
METER CAN INSPECTION
| |
11/21/2022 11:44:14 AM
| air |
|
PAID UTILITY RECEIPT REQUIRED
| SJCUD |
6/16/2022 12:13:28 PM
| bshugart |
|
SOLID WASTE FEE DUE
| 22-038289 |
6/7/2022 2:47:44 PM
| bshug |
|
TERMITE BOND CO
| TURNER;BAIT |
4/20/2022 2:10:21 PM
| kcooper |
|
TERMITE PROTECTION CERT OF COMPL
| |
3/3/2023 7:59:31 AM
| ccontestabile |