|
7th Edition FBC (2020)
| |
| |
|
EARLY POWER LETTER REC'D
| |
9/14/2022 11:49:32 AM
| cgalloway |
|
ENGINEER ELEVATION CERTIFICATION
| |
6/8/2022 10:32:23 AM
| dwintons |
|
HOLD C/O FOR SUBDIVISION ASBUILT APPROVAL
| |
6/10/2022 2:46:31 PM
| BOCC |
|
IMPACT FEE DUE
| 22-060884 |
9/15/2022 12:50:07 PM
| nbrad |
|
INFO NOC-
| BK 5513 PG 589 |
4/29/2022 2:10:49 PM
| slkling |
|
LANDSCAPE INSPECTION REQ
| |
3/9/2023 10:08:10 AM
| |
|
LOT GRADING INSP REQ PRIOR C/O
| |
3/9/2023 8:03:33 AM
| |
|
METER CAN INSPECTION
| |
9/15/2022 12:05:48 PM
| air |
|
PAID UTILITY RECEIPT REQUIRED
| SJCUD |
9/23/2022 11:06:08 AM
| kcooper |
|
SOLID WASTE FEE DUE
| 22-026332 |
4/20/2022 10:45:28 AM
| ecann |
|
TERMITE BOND CO
| TURNER;WOOD |
4/20/2022 8:32:41 AM
| kcooper |
|
TERMITE PROTECTION CERT OF COMPL
| |
3/30/2023 3:50:28 PM
| bshugart |