|
7th Edition FBC (2020)
| |
| |
|
EARLY POWER LETTER REC'D
| |
9/14/2022 10:38:45 AM
| slkling |
|
ENGINEER ELEVATION CERTIFICATION
| |
7/19/2022 1:48:29 PM
| dwintons |
|
HOLD C/O FOR SUBDIVISION ASBUILT APPROVAL
| |
3/24/2022 2:16:16 PM
| ttrezza |
|
IMPACT FEE DUE
| 22-047382 |
7/15/2022 1:37:18 PM
| dwint |
|
INFO NOC-
| 5565;1514 |
5/26/2022 9:36:41 AM
| ecannon |
|
LANDSCAPE INSPECTION REQ
| |
12/15/2022 9:09:19 AM
| |
|
LOT GRADING INSP REQ PRIOR C/O
| |
12/21/2022 1:19:23 PM
| |
|
METER CAN INSPECTION
| |
9/14/2022 9:34:33 AM
| air |
|
PAID UTILITY RECEIPT REQUIRED
| SJCUD |
9/16/2022 1:36:00 PM
| slkling |
|
SOLID WASTE FEE DUE
| 22-024301 |
4/12/2022 10:37:40 AM
| kcoop |
|
TERMITE BOND CO
| TURNER;WOOD |
4/12/2022 10:37:22 AM
| kcooper |
|
TERMITE PROTECTION CERT OF COMPL
| |
8/5/2022 3:04:12 PM
| slkling |