|
7th Edition FBC (2020)
| |
| |
|
EARLY POWER LETTER REC'D
| |
9/14/2022 11:50:58 AM
| cgalloway |
|
ENGINEER ELEVATION CERTIFICATION
| |
6/8/2022 10:33:43 AM
| dwintons |
|
HOLD C/O FOR SUBDIVISION ASBUILT APPROVAL
| |
6/10/2022 2:46:31 PM
| BOCC |
|
IMPACT FEE DUE
| 22-060883 |
9/15/2022 12:48:33 PM
| nbrad |
|
INFO NOC-
| BK 5522 PG 1258 |
4/13/2022 10:37:42 AM
| slkling |
|
LANDSCAPE INSPECTION REQ
| |
2/21/2023 9:57:40 AM
| |
|
LOT GRADING INSP REQ PRIOR C/O
| |
2/22/2023 5:29:49 PM
| |
|
METER CAN INSPECTION
| |
9/15/2022 9:43:51 AM
| air |
|
PAID UTILITY RECEIPT REQUIRED
| SJCUD |
9/21/2022 9:10:00 AM
| slkling |
|
SOLID WASTE FEE DUE
| 22-025029 |
4/14/2022 10:32:20 AM
| bshug |
|
TERMITE BOND CO
| TURNER;WOOD |
4/12/2022 9:15:34 AM
| kcooper |
|
TERMITE PROTECTION CERT OF COMPL
| |
3/9/2023 3:07:08 PM
| ccontestabile |