|
7th Edition FBC (2020)
| |
| |
|
EARLY POWER LETTER REC'D
| |
8/9/2022 8:50:43 AM
| slkling |
|
ENGINEER ELEVATION CERTIFICATION
| |
6/30/2022 9:30:53 AM
| thowe |
|
HOLD C/O FOR SUBDIVISION ASBUILT APPROVAL
| |
3/24/2022 1:51:15 PM
| ttrezza |
|
IMPACT FEE DUE
| 22-041938 |
6/22/2022 10:09:23 AM
| dwint |
|
INFO NOC-
| BK:5558 PG:1397 |
5/13/2022 4:15:58 PM
| bmsmith |
|
LANDSCAPE INSPECTION REQ
| |
12/15/2022 9:09:41 AM
| |
|
LOT GRADING INSP REQ PRIOR C/O
| |
12/29/2022 9:37:05 AM
| |
|
METER CAN INSPECTION
| |
9/8/2022 8:39:31 AM
| air |
|
PAID UTILITY RECEIPT REQUIRED
| SJCUD |
9/13/2022 3:31:15 PM
| slkling |
|
SOLID WASTE FEE DUE
| 22-023934 |
4/11/2022 10:17:12 AM
| kcoop |
|
TERMITE BOND CO
| TURNER;WOOD |
4/11/2022 10:16:53 AM
| kcooper |
|
TERMITE PROTECTION CERT OF COMPL
| |
7/15/2022 3:34:30 PM
| khart |